BIMSafe NZ
BIMSafe NZ
  • 38
  • 2 918

Відео

BIMSafe Case study 29: BIM Visualisation at the University of Auckland by Facilities Management.
Переглядів 1221 годину тому
In this video, we look at the FM team utilising BIM models for safe design, maintenance, and use of services at the University of Auckland
BIMSafe Case study 22: Facilities Management BIMSafe Review Process at the University of Auckland
Переглядів 1521 годину тому
At the University of Auckland, the facilities management team collaborate in construction review processes to ensure safe maintenance and operation of redeveloped and new facilities
BIMSafe Case Study 15: Latest Open Space functionality with Augmented Reality
Переглядів 15День тому
ON the ACC Otepoti building, the use of open space and augmented reality enables greater levels of accuracy and comparison between the BIM model and the as-built environment.
BIMSafe Case study 11 Use of BIM to Improve Site Culture among subtrades.
Переглядів 33День тому
On the ACC Otepoti building, and the Court Theatre, the use of a federated BIM model has enabled greater collaboration and coordination amongst the sub trades, and this has had a positive effect on site culture
BIMSafe Case Study 10. Use of 4D animation for safe work planning
Переглядів 15День тому
On the ACC Otepoti Building in Dunedin, the project team used a 4D animation from the BIM model to plan and sequence the installation of structural steel, floor, and facade
BIMSafe Case Study 21 Court Theatre- Developing a Culture of Collaboration through BIM
Переглядів 323 місяці тому
On the Court Theatre project, the use of Building Information Modelling (BIM) has fostered a more collaborative culture among subcontractors, encouraging them to consider the work of other trades and coordinate their efforts more effectively. By providing a holistic view of the project and enabling better communication, BIM has helped to break down the "first in best dressed" mentality and prom...
BIMSafe Case Study 20 Court Theatre Pre planning for safer work methodology
Переглядів 183 місяці тому
On the Court Theatre project in Christchurch, the use of Building Information Modelling (BIM) enabled the project team to proactively plan for safer working conditions. By leveraging 3D modeling and collaborative processes, the team identified potential issues early and developed strategies to mitigate risks. This approach led to reduced need for working at heights, minimized manual handling, a...
BIMSafe Case Study 12 Colin's Story
Переглядів 833 місяці тому
In the mechanical services industry, experienced workers like Colin Gray, a contract pipe fitter and welder, are benefiting from the use of Building Information Modelling (BIM) and 3D modelling. These technologies allow older workers to continue contributing their valuable skills while minimising physical risks associated with working on-site. By enabling remote work and prefabrication, BIM and...
BIMSafe Case Study Video 17 Services Clash detection ACC Otepoti
Переглядів 473 місяці тому
On the ACC Ōtepoti project, project, the use of Building Information Modeling (BIM) and collaborative processes enabled the project team to focus on potential health and safety hazards that could occur during construction and installation of services, particularly in ceiling spaces. By leveraging a federated 3D model and facilitating open communication among stakeholders, including contractors ...
BIMSafe Case Study video 27 Helix Global Prefabricated Residential Construction
Переглядів 253 місяці тому
Helix Global is pioneering New Zealand's first fully off-site manufactured residential home. By leveraging Building Information Modelling (BIM) technology, the company has been able to address the unique challenges associated with prefabricated construction, transportation, and on-site assembly. The use of BIM has enabled Helix Global to enhance safety throughout the entire process, from factor...
BIMSafe case Study 13 DBC BIM Parts Modelling and prefabrication
Переглядів 643 місяці тому
DBC Contractors utilized Building Information Modelling (BIM) and advanced manufacturing techniques to improve safety and efficiency in the mechanical services installation for the Dunedin Outpatients Building. By leveraging 3D modelling and direct-to-fabrication processes, the team significantly reduced on-site work at height, improved accuracy, and created a safer work environment.
BIMSafe Case Study video 14 Facade Install Improvement
Переглядів 743 місяці тому
On the ACC Ōtepoti project, the use of Building Information Modelling (BIM) and collaborative processes enabled the project team to identify and resolve potential health and safety hazards related to the façade installation process. By leveraging the 3D model and facilitating open communication among stakeholders, including contractors and consultants, the team could thoroughly investigate and ...
BIMSafe Case Study Video 26 New BIM User
Переглядів 633 місяці тому
On the ACC Ōtepoti project, the introduction of Building Information Modelling (BIM) to a seasoned construction professional with 23 years of experience in traditional 2D environments has demonstrated the significant potential for improving safety planning, communication, and issue resolution. By leveraging the 3D model's interactive capabilities, the team was able to visualize and address pote...
BIMSafe Case study 19 John Jones Steel
Переглядів 553 місяці тому
John Jones Steel has been utilizing 3D modelling technology for over 20 years, with a strong focus on improving health and safety in construction processes. By leveraging Building Information Modelling (BIM), the company has significantly enhanced its ability to design safer construction methods, increase prefabrication, and optimize on-site assembly processes. This approach has led to improved...
BIMSafe Case study 25: City Rail Link Driver Training
Переглядів 203 місяці тому
BIMSafe Case study 25: City Rail Link Driver Training
BIMSafe case Study 24: City Rail Link Virtual Induction
Переглядів 213 місяці тому
BIMSafe case Study 24: City Rail Link Virtual Induction
BIMSafe Case Study Video 16 Contractor project communication, and planning
Переглядів 513 місяці тому
BIMSafe Case Study Video 16 Contractor project communication, and planning
BIMSafe Case Study Video 28: Contractor Hazard ID and risk mitigation
Переглядів 313 місяці тому
BIMSafe Case Study Video 28: Contractor Hazard ID and risk mitigation
BIMSafe Case Study 23 Water care Digital Enterprise Model
Переглядів 303 місяці тому
BIMSafe Case Study 23 Water care Digital Enterprise Model
BIMSafe Case Study Video 18: Southbase Hilti Robot
Переглядів 2333 місяці тому
BIMSafe Case Study Video 18: Southbase Hilti Robot
BIMSafe Presentation video 1 Seeing The Unseen: Robin Findlay, DE Manager, Auckland Airport
Переглядів 407 місяців тому
BIMSafe Presentation video 1 Seeing The Unseen: Robin Findlay, DE Manager, Auckland Airport
BIMSafe Presentation video 2. DE to support H&S on Infrastructure Projects Farzam Farzadi BECA
Переглядів 277 місяців тому
BIMSafe Presentation video 2. DE to support H&S on Infrastructure Projects Farzam Farzadi BECA
BIMsafe Presentation video 4. HSA using BIM to their advantage. Jen Dransfield, Naylor Love
Переглядів 257 місяців тому
BIMsafe Presentation video 4. HSA using BIM to their advantage. Jen Dransfield, Naylor Love
BIMsafe Presentation video 5. BIM For Safety On Auckland’s City Rail Link Project. Dean Burke WSP
Переглядів 387 місяців тому
BIMsafe Presentation video 5. BIM For Safety On Auckland’s City Rail Link Project. Dean Burke WSP
BIMSafe Case Study Video 5: Contractors Using BIM For Health And Safety.
Переглядів 1537 місяців тому
BIMSafe Case Study Video 5: Contractors Using BIM For Health And Safety.
BIMSafe case Study Video 6: ACC Otepoti A BIM Manager’s View on BIM For Installation.
Переглядів 1077 місяців тому
BIMSafe case Study Video 6: ACC Otepoti A BIM Manager’s View on BIM For Installation.
BIMSafe Case Study Video 7: ACC Otepoti: Reducing Plant Room Risks In Installation.
Переглядів 1037 місяців тому
BIMSafe Case Study Video 7: ACC Otepoti: Reducing Plant Room Risks In Installation.
BIMSafe Case Study Video 8. ACC Ōtepoti Building -Project Managers Perspective Using OpenSpace .
Переглядів 3467 місяців тому
BIMSafe Case Study Video 8. ACC Ōtepoti Building -Project Managers Perspective Using OpenSpace .
BIMsafe Presentation video 6. A New Resource For H&S by C Erasmus and M Anzano, Steel and Tube
Переглядів 127 місяців тому
BIMsafe Presentation video 6. A New Resource For H&S by C Erasmus and M Anzano, Steel and Tube

КОМЕНТАРІ