Brent N Cleeton
Brent N Cleeton
  • 43
  • 187 410

Відео

D4100 Dick Hardy pilots 43044 and 43274 into Kidderminster Carriage & TMD yard. 22.07.2021
Переглядів 3753 роки тому
Power cars going into the yard to be split and turned on the turntable. 43044 then going by road to Ruddington.
37057 on 5Z21 arriving Kidderminster, SVR on 22.07.2021.
Переглядів 1603 роки тому
Power cars 43251/257/044/274.
30-ton steam crane. Severn Valley Railway.
Переглядів 1,2 тис.3 роки тому
Water tank dismantling. Eardington Halt. April 20th 2021.
30 ton steam crane. Severn Valley Railway.
Переглядів 4763 роки тому
Water tank being dismantled at Eardington Halt,Severn Valley Railway. April 20th,2021.
Severn Valley Railway, MEWP. 10th Dec 2020.
Переглядів 7223 роки тому
Road/rail MEWP arriving at Bridgnorth.
Bewdley South Bracket Signal Removal. 1st October 2020. Severn Valley Railway.
Переглядів 2,3 тис.4 роки тому
30 ton steam crane ADM 1091/30 transporting the severed signal post to Bewdley Station Yard.
SVR. Hampton Loade Dn Distant. Trees fouling traffic
Переглядів 2934 роки тому
Felling badly leaning Alder trees, in Alveley Woods. 29.07.20 Filmed by Leigh King.
50035 Ark Royal
Переглядів 1954 роки тому
The Ark propelling Seacows and a single Dogfish into 2EL at Kidderminster, SVR. 29.07.20
SVR, Falling Sands Viaduct, Kidderminster. 31/12/2019
Переглядів 1,6 тис.4 роки тому
Sleeper pulling - track removal.
33108. Rear cab ride 11th May 2017.
Переглядів 905 років тому
Bewdley to Kidderminster light engine.
33108 Severn Valley Railway, 9th November 2018
Переглядів 5755 років тому
Propelling the rake of Seacows to Highley, from Bank Fm.
Ballast sharking. Severn Valley Railway 9th November 2018.
Переглядів 4135 років тому
Shark, ballast ploughing MP 141 3/4.
SVR Case road/railer, at MP141 3/4. 5th Nov 2018
Переглядів 1495 років тому
Picking out individual bullhead sleepers.
Bank Farm, Severn Valley Railway. 5th Nov 2018
Переглядів 7 тис.5 років тому
Bank Farm, Severn Valley Railway. 5th Nov 2018
Oakworth Station. 130 Roadrailer with Railertrailer. 23.05.2018
Переглядів 3036 років тому
Oakworth Station. 130 Roadrailer with Railertrailer. 23.05.2018
Keighley Station. 23rd May 2018.
Переглядів 5386 років тому
Keighley Station. 23rd May 2018.
Ingrow. Road/rail 130 Landrover and Railertrailer. May 23rd 2018.
Переглядів 1,4 тис.6 років тому
Ingrow. Road/rail 130 Landrover and Railertrailer. May 23rd 2018.
Digging out beds. Severn Valley Railway. 8th March 2017.
Переглядів 14 тис.6 років тому
Digging out beds. Severn Valley Railway. 8th March 2017.
Severn Valley Railway. Drilling rig tracking to site. 8th March 2017
Переглядів 1,1 тис.6 років тому
Severn Valley Railway. Drilling rig tracking to site. 8th March 2017
Class 50: Worms - eye view!
Переглядів 1056 років тому
Class 50: Worms - eye view!
Western : Worms - eye view!
Переглядів 1296 років тому
Western : Worms - eye view!
Loram rail grinder units DR 79301/02/03/04.
Переглядів 1796 років тому
Loram rail grinder units DR 79301/02/03/04.
Hitachi Zaxis 350 LCN sheet piling,Severn Valley Railway. 16.08.2017
Переглядів 2337 років тому
Hitachi Zaxis 350 LCN sheet piling,Severn Valley Railway. 16.08.2017
Hitachi Zaxis 135us County Boundary SVR 16.08.2017
Переглядів 3,4 тис.7 років тому
Hitachi Zaxis 135us County Boundary SVR 16.08.2017
66763 Severn Valley Railway 26.07.2017
Переглядів 3007 років тому
66763 Severn Valley Railway 26.07.2017
SVR 12/07/2017. Hitachi tracked dumper delivers rock armour onto riverside.
Переглядів 2047 років тому
SVR 12/07/2017. Hitachi tracked dumper delivers rock armour onto riverside.
SVR,12/07/2017. Komatsu PC210LC placing rock armour into the riverbank.
Переглядів 797 років тому
SVR,12/07/2017. Komatsu PC210LC placing rock armour into the riverbank.
Hitachi tracked dumper and Komatsu PC210LC. Severn Lodge Fm, SVR 12/07/2017
Переглядів 3457 років тому
Hitachi tracked dumper and Komatsu PC210LC. Severn Lodge Fm, SVR 12/07/2017
10 ton Hitachi dumper. 07.07.2017
Переглядів 2,9 тис.7 років тому
10 ton Hitachi dumper. 07.07.2017

КОМЕНТАРІ

  • @that_youtube_channel7343
    @that_youtube_channel7343 4 дні тому

    Worked on a tamper, the 08’s make you sea sick, the 09’s are continuous tampers, much better 👍🏼

  • @BLUESKY-zt1nv
    @BLUESKY-zt1nv 2 місяці тому

    RAIL TAMPERING COULD COST YOU MORE THAN JUST A FINE £5000 and 10 years in jail .

  • @Beechgoose1
    @Beechgoose1 Рік тому

    Anyone who thinks these machines are cool, has never been woken up by one in the middle of the night.😵

  • @fayestevenson7685
    @fayestevenson7685 Рік тому

    here bcos i just discovered what this machine is because i got woken up by it at 2:30 am ! x

  • @hayleyandrews9938
    @hayleyandrews9938 Рік тому

    Ere curzonbviaduct set me off magnificent view

  • @rogersavoie4570
    @rogersavoie4570 2 роки тому

    First time I see a Plasser with double tamping tools inside and single outside, also surfaces very slowly for a high production machine, I operated many different types for years.

  • @bav8043
    @bav8043 2 роки тому

    Can Tamper reserve?

  • @momlikesmemore
    @momlikesmemore 2 роки тому

    Plus I like the equipment that redistributes the gravel

  • @momlikesmemore
    @momlikesmemore 2 роки тому

    So cool whoever invented this. How often do they tamp it? And how do the keep vegetation from growing around the tracks?

    • @brentncleeton9771
      @brentncleeton9771 2 роки тому

      The track gets a maintenence tamp once a year. Ballast is sprayed with a total herbicide annually to keep the stone clean and weed free.

  • @kevinstaddon8517
    @kevinstaddon8517 2 роки тому

    Useful being able to move the lifting assembly to clear fishplates and fastenings, compared with fixed 07.

  • @syottv1045
    @syottv1045 2 роки тому

    Good work

  • @marktucker208
    @marktucker208 2 роки тому

    A tamping machine is working right next to my house as I type 😭

    • @Beechgoose1
      @Beechgoose1 Рік тому

      It's 2am, one of these has just woke me up. Wondered what the fack was going on!

  • @JohnSmith-vi5pz
    @JohnSmith-vi5pz 2 роки тому

    What happens if you lift too much, pushing the sleepers down again is surely not such an easy task?

    • @brentncleeton9771
      @brentncleeton9771 2 роки тому

      If height clearance isn't an issue, then you'd go back and lift to the new level. Tunnels and bridges,etc would mean cutting out ballast to lower the track again. The pre-tamping recording pass of the machine over the worksite determines levels and computer does the rest.

  • @plassermachineoperation
    @plassermachineoperation 3 роки тому

    Nice

  • @plassermachineoperation
    @plassermachineoperation 3 роки тому

    But good job

  • @plassermachineoperation
    @plassermachineoperation 3 роки тому

    Blast efficiency

  • @ArticGunship
    @ArticGunship 3 роки тому

    Interesting’ you can really see that the track is a few cm higher after the tampering

    • @brentncleeton9771
      @brentncleeton9771 3 роки тому

      This area of farm crossing got a total lift of 150mm from the level we laid and this machine wouldn't allow that much. Completed in 3 passes though. Computer very definitely said no!

  • @ss-yg5ot
    @ss-yg5ot 3 роки тому

    Packing machine

  • @Eugene_Jaid
    @Eugene_Jaid 3 роки тому

    прикол)

  • @juanfranciscocontreras8331
    @juanfranciscocontreras8331 3 роки тому

    Me gustaría hablar con alguien que haya trabajado en una tamper 3000

  • @paulwilson2651
    @paulwilson2651 3 роки тому

    Do they use these machines at night?

    • @brentncleeton9771
      @brentncleeton9771 3 роки тому

      99% of all the work that on-track machines like this do is at night.

    • @paulwilson2651
      @paulwilson2651 3 роки тому

      @@brentncleeton9771 Thanks for that.

  • @حسينازهر-ف7ن
    @حسينازهر-ف7ن 3 роки тому

    ج

  • @TheDemon3666
    @TheDemon3666 3 роки тому

    Saw a group of the 09-16 Dyna cats cross the rails yesterday. Weirdest yet coolest looking rail machinery I've ever seen. Had to look em up and see what they are and do. Needless to say, mind blown. -Jett

  • @BLUESKY-zt1nv
    @BLUESKY-zt1nv 3 роки тому

    rails should NEVER be tampered with ..its a criminal offence .

  • @ابوهاشم-ض1ح5س
    @ابوهاشم-ض1ح5س 3 роки тому

    سلام عليكم ورحمه الله أخواني أسعد الله صباحكم ومسائكم فضلا الاشتراك بقناتي على اليوتيوب وجزاكم الله كل خير أخوكم من سوريا 😊😊👍👍👍👍

  • @williamtacey7770
    @williamtacey7770 4 роки тому

    Kidderminster Falling Sands Viaduct was closed last year since Christmas 2019

  • @drewnos
    @drewnos 4 роки тому

    it's very blurred for me :(

  • @skog4437
    @skog4437 4 роки тому

    lowest priority i'm sure, but do you know if there are any plans to paint the engineering fleet? those secows are too late for olive, but some grey and yellow might be nice

  • @spaceiswater6539
    @spaceiswater6539 4 роки тому

    I wonder if you can help me? Do Tamping machine's have lasers on them and if they do, do they point upwards towards the sky and what colour are the laser beams on them?

    • @Umbrey_Dunctum
      @Umbrey_Dunctum 3 роки тому

      Lol ...that’s what I came to find out too, after seeing a vid on the Wales incident and Amsterdam UFO video.

    • @spaceiswater6539
      @spaceiswater6539 3 роки тому

      @@Umbrey_Dunctum I found out on another channel that they dont point up to the sky only point towards the track. As I got told there is no reason to point them to the sky. I hope that helps.

    • @MikeInExile
      @MikeInExile Рік тому

      Many years ago, I worked in a building that backed up to a RR spur in a business district. I could look up and down the track behind our building and see that track was an _absolute mess_ both horizontally AND vertically! It was amazing (and kind of scary) to see how much a locomotive and cars would wiggle and move around when coming up the track! Anyway... One day a machine similar to the one in this video came along and worked on the track. As luck would have it, the crew stopped for lunch right behind our building so they could sit on the lawn under a tree and eat! That gave me a perfect opportunity to run out there and ask 'em a bunch of questions about the equipment they were using. One of the questions I had for them was, how does the tamper **know** how much to lift/shift the track? What I was told was that they setup a laser much further down the track ahead of the tamper. The laser beam is directed _back_ at the tamper, and the tamper then uses sensors and a computer to calculate exactly how much to lift/move the track to maintain itself on the beam. For what it's worth, I went out there the next day and the track looked absolutely perfect!!! Another crew came along within the next day or so and added more gravel, and the next time I watched a train come through, it had NO side-to-side, up-and-down, or swaying movement at all!!!

  • @jacob-rc3ji
    @jacob-rc3ji 4 роки тому

    Cool video Brent thanks for posting

  • @joethetrainphotographerink7018
    @joethetrainphotographerink7018 4 роки тому

    Nice one mate I'm a train spotter

  • @TOB-mi2do
    @TOB-mi2do 5 років тому

    What locomotive

    • @brentncleeton9771
      @brentncleeton9771 5 років тому

      33108 with Dave Evans at the controls.

    • @TOB-mi2do
      @TOB-mi2do 5 років тому

      Brent N Cleeton nice , I’m heading there on Saturday

  • @Oleg-et7jk
    @Oleg-et7jk 6 років тому

    Off-road king !! A Russian does not want to !!