- 37
- 347 895
Dirk Bondy
United States
Приєднався 13 тра 2012
I teach the design of post-tensioned concrete at UCLA and Cal Poly San Luis Obispo. I am also the president of Seneca Structural Engineering, Inc. located in Newport Beach, CA.
Відео
Lecture 14 - Two Way Slabs by Bryan Allred 2023
Переглядів 5963 місяці тому
Introduction to Two-Way slabs by Bryan Allred.
Lecture 17 - Two Way Slab Part 3
Переглядів 2283 місяці тому
Two-Way Post-Tensioned Slab Design Part 3
Lecture 16 - Two Way Slabs Part 2
Переглядів 2023 місяці тому
Two-Way Post-Tensioned Slab Design - Part 2
Lecture 15 - Two Way Slab Example Part 1
Переглядів 4113 місяці тому
Design of Two-Way Post-Tensioned Concrete Slabs Part 1
Lecture 13 - One Way Slabs
Переглядів 2403 місяці тому
Complete design of one-way post-tensioned concrete slabs.
Lecture 12 - Project Part 3
Переглядів 1053 місяці тому
Part 3 of the two-span post-tensioned concrete beam design project.
Lecture 11 - Project Part 2
Переглядів 2453 місяці тому
Part 2 of the two-span post-tensioned beam design project.
Lecture 9 - Shear Design
Переглядів 2383 місяці тому
Welcome to the confusing and frustrating world of shear design in post-tensioned concrete.
Lecture 5 - Flexural Stresses in Indeterminate Members (2023)
Переглядів 1,2 тис.Рік тому
Calculation of flexural stresses in post-tensioned indeterminate systems.
Lecture 8 - Flexural Demand Moments (2023)
Переглядів 518Рік тому
Calculation of Flexural Demand Moments in Post-Tensioned Concrete. Secondary reactions, shears and moments presented.
Lecture 7 - Flexural Strength Continued (2023)
Переглядів 527Рік тому
Flexural strength of pre-tensioned and post-tensioned beams continude.
Lecture 6 - Flexural Strength (2023)
Переглядів 711Рік тому
Flexural strength of pre-tensioned and post-tensioned concrete beams.
Lecture 4 - Review of Moment Distribution (2023)
Переглядів 861Рік тому
Lecture 4 - Review of Moment Distribution (2023)
Lecture 3 - Flexural Stresses Continued (2023)
Переглядів 947Рік тому
Lecture 3 - Flexural Stresses Continued (2023)
Lecture 2 - Equivalent Loads and Flexural Stresses (2023)
Переглядів 1,9 тис.Рік тому
Lecture 2 - Equivalent Loads and Flexural Stresses (2023)
Lecture 1 - Introduction to Post-Tensioned Concrete (2023)
Переглядів 4,4 тис.Рік тому
Lecture 1 - Introduction to Post-Tensioned Concrete (2023)
Dirk Bondy Podcast Interview with the Civil Engineering Academy
Переглядів 3,3 тис.2 роки тому
Dirk Bondy Podcast Interview with the Civil Engineering Academy
Strengthening & Repair of Existing Structures using External Post-Tensioning
Переглядів 6 тис.3 роки тому
Strengthening & Repair of Existing Structures using External Post-Tensioning
Seismic Analysis Lecture #11 Pushover Analysis - Dirk Bondy, S.E.
Переглядів 48 тис.5 років тому
Seismic Analysis Lecture #11 Pushover Analysis - Dirk Bondy, S.E.
Ken Bondy One-Way Post-Tensioned Slab Design Example (2015)
Переглядів 5 тис.6 років тому
Ken Bondy One-Way Post-Tensioned Slab Design Example (2015)
The History of Post-Tensioned Concrete in the U.S. - Ken Bondy
Переглядів 3,8 тис.6 років тому
The History of Post-Tensioned Concrete in the U.S. - Ken Bondy
Seismic Analysis Lecture #7 - Dirk Bondy, S.E.
Переглядів 15 тис.7 років тому
Seismic Analysis Lecture #7 - Dirk Bondy, S.E.
Seismic Analysis Lecture #8 - Dirk Bondy, S.E.
Переглядів 15 тис.7 років тому
Seismic Analysis Lecture #8 - Dirk Bondy, S.E.
Seismic Analysis Lecture #10 - Dirk Bondy, S.E.
Переглядів 10 тис.7 років тому
Seismic Analysis Lecture #10 - Dirk Bondy, S.E.
Seismic Analysis Lecture #9 - Dirk Bondy, S.E.
Переглядів 13 тис.7 років тому
Seismic Analysis Lecture #9 - Dirk Bondy, S.E.
Seismic Analysis Lecture #6 - Dirk Bondy, S.E.
Переглядів 18 тис.7 років тому
Seismic Analysis Lecture #6 - Dirk Bondy, S.E.
Seismic Analysis Lecture #5 - Dirk Bondy, S.E.
Переглядів 40 тис.7 років тому
Seismic Analysis Lecture #5 - Dirk Bondy, S.E.
Hello Mr.Dirk I have watched all of your lectures on post-tensioning and they are very interesting and I was looking for an advanced or a High Rise RC Building Design online pre-recorded Course if you have any or you can recommend me for someone who gives such courses. There are not a lot out there or they are not easily accessible. And by the way the way you teach is so entertaining.
Hi, Thank you for the kind words. Unfortunately, I don't know of a pre-recorded course that fits that description. Good luck.
Thankyou for your reply Mr.Dirk
Thank you, really helped. 🙂
You are a legend. No one can explain it in such a simplistic way the way you have done. An incredible job.
An amazing video on PT design ....God bless you
Best video I've seen on the Internet in a very long time 🙂🙂🙂
Thanks a lot for such a magnificent intellectual banquet. I would like to be one day as good engineer as you are.
Hello Mr Bondy. Please allow me to ask the following question: in minute 49 you say that does not make a lot of sense expending a lot of money on heavy confinement detailing at some floors where our analysis shows yielding is never going to happen. Does that mean we could ignore the code (ACI 318 for concrete) at those locations ? Is that permitted? Thanks a lot in advance
If the building department has allowed you to do a "performanced based design" and you show numerically that less confinement performs adequately, then you are allowed to do that. This is not ignoring the code, though. It's just using what the code allows as an alternate.
Thanks a lot for taking time to answer my question. Your are contributing to my professional growth.
Thanks a lot for sharing your knowledge! I truly enjoy watching your videos because of the background and theory you include in them. I'm a new to nonlinear analysis. Would you please share your favourite literature on that topic?
how much do you earn
A tremendous amount
hearing stories of an old structural engineer while a pushover non linear analysis running in the background
I believe that the reason "Vc" formula provides smaller value for critical shear section #2 compared to section #1, is that rupture mechanism in section #1 is two-way shear failure but when you get away from the column, rupture mechanism shifts to one way shear failure. As a result, concrete resistance in section #2 is calculated by a another formula.
Hi Farzan, That doesn't make sense to me. When section #1 doesn't work we have two choices....add studrails or column caps. They both do the same thing and move the 2nd shear plane to effectively the same place. But with column caps we still use the two-way concrete capacity. Only with studrails are we required to cut the capacity of this shear plane in half.
@dirkbondy With your explanation Dr. Bondy, I only have 1 guess left. Shear reinforcement doesn't start to resist loads effectively until some cracks start to happen in concrete. Maybe this is the reason that code acts more conservative with sections that have shear rebar 🤔
Thank you very much doctor, i need the name of the book if you can tell me!
Go to www.Lulu.com. Search "Post-Tensioned Concrete Principles and Practice"
Hi Mr. Bondy. According to table 20.3.2.5.1 in ACI 318-19, Maximum permissible tensile stress in strands is 0.7fpu. Is this limit only for service limit state? Because when I calculate strand stress for ultimate flexural strength state (according to formula 20.3.2.3.1) , I get fps=0.95fpu. Is this a violation of the code?
The section you are referencing is only for the stressing end immediately after anchoring. It is not the actual stress in the strand. However, it is easily shown that this requirement is exceeded effectively on every project every time. We have tried to argue that this is not an actual maximum requirement but more of a minimum expected stress. It is very difficult to change the code for p/t these days, though.
@dirkbondy Thanks for the insight 🙏🏻
Good Lecture🤩
Thank you for your videos professor, I didn´t learned about post tension design at the university so i'm learning a lot!, may I just ask a question? does the parabola have an offset from the middle? the calculations of "a" accounting an average of 4 and 8 made me believe it was at the center however a cuadratic parabola is symmetric, so is the error negligible? or are there 2 differente parabolas ? Thank you! Greetings from Peru. Juan
The calculation is done at the midspan of a tilted parabola.
I have started reading the book titled "Post-Tensioned Concrete Principles and Practice" and I must say I'm deeply thankful to the authors of this book. I have read almost 80 pages and I'm starting to understand the principles behind post tension concrete. I had read another book but I struggled to understand it. Your book was a blessing to me. Thank you Mr. Bondy and Mr. Allred a thousand times. ❤❤
Very interesting,from morocco
In what document can i have the reference to that?
whenever i need a revision, i revisit this channel, the most amazing professor i ever seen, Mr dirk bondy...
Wow, every time I see this video. Incredible Professor! Thank You.
Wow, thanks!
I wish I could learn from you. Says someone who already has a Ph.D. in Structural Engineering and feels nothing has learnt so far
Hello,Dirk sir . Kudos from India. You are doing great work . I wanted your notes can you confirm your mail id so i can ask you there?
Dear Sir, How are you sir? I am from Ethiopia, a third world country in Africa. I listened to your amazing lecture and it helped me and the project that I am in so much. I have no clue about PT before. I only design so many RC buildings. But after I listened your lectures multiple time and after I read your book once, I become a good PT Structural Designer. We are benefited a lot from your brilliance. Thank you so much for preparing a wonderful lecture for all of us in the world. Your lectures are very easy to follow and you make hard topics an easy ones. Plus your funny remarks in the lectures are so entertaining. I know you are very busy since you are involved in big projects. If you have a little time, I have two questions for you. Please answer them by giving me time from your busy schedule. The Questions are: 1. Here in my country, There is a practice of pouring concrete of the Column below and the Slab at once to save time. We have been doing it many times for RC Buildings. Can we do that for the PT? Can we cast the Concrete of the Column and PT Slab at once? What are the things we should do if we can cast them simultaneously? 2. There is a myth here in Ethiopia that it is not possible to continue the Construction of the next Floor like Column rebar work in PT slab Construction. Is it possible to do the construction of the next Floor the next day after the PT Slab is casted. How many days should we wait before we start the next Floor Construction? What are the measures we should take other than back propping to start the next Floor Construction as soon as possible. Sir, I know my questions are many and it might take time from your busy schedule. But if you get a little time, please answer them. Thank you so much for your patience and kindness in advance. God bless you!
Dear Sir, How are you sir? I am from Ethiopia, a third world country in Africa. I listened to your amazing lecture and it helped me and the project that I am in so much. I have no clue about PT before. I only design so many RC buildings. But after I listened your lectures multiple time and after I read your book once, I become a good PT Structural Designer. We are benefited a lot from your brilliance. Thank you so much for preparing a wonderful lecture for all of us in the world. Your lectures are very easy to follow and you make hard topics an easy ones. Plus your funny remarks in the lectures are so entertaining. I know you are very busy since you are involved in big projects. If you have a little time, I have two questions for you. Please answer them by giving me time from your busy schedule. The Questions are: 1. Here in my country, There is a practice of pouring concrete of the Column below and the Slab at once to save time. We have been doing it many times for RC Buildings. Can we do that for the PT? Can we cast the Concrete of the Column and PT Slab at once? What are the things we should do if we can cast them simultaneously? 2. There is a myth here in Ethiopia that it is not possible to continue the Construction of the next Floor like Column rebar work in PT slab Construction. Is it possible to do the construction of the next Floor the next day after the PT Slab is casted. How many days should we wait before we start the next Floor Construction? What are the measures we should take other than back propping to start the next Floor Construction as soon as possible. Sir, I know my questions are many and it might take time from your busy schedule. But if you get a little time, please answer them. Thank you so much for your patience and kindness in advance. God bless you!
dear mr.dirk. Can the piles on continuous jetty / harbour or pile on slab bridge can be have reduction factor (ductility) by checking it using push over, since usually the pile is must be elastic in seismic condition
Typically we only use a push-over analysis on highly indeterminate structures. Piles are determinate.
well don't be sad about it at least you warned the world and you delivered your message how the world react to it is not your part you did your part
Thanks for your support :)
Dear Dirk, could you advise or share experience POA with X-braced frame? I am curious should we consider brace (I guess tensioned bracing only as compressed buckled member is not a part of stiffening system) and proceed loading the frame until a brace/column yields (what first happen)? Without braces it is quite predictable the sequence of forming plastic hinges, but I couldn't understand how it should be when X-bracing system is incorporated into frame. Apologies if my question seemed to be stupid 😊
Not at all a bad question. I don't have much experience with push-over analyses on x-braced frames. Their hysteretic behavior is much different than a more stable yielding beam so load distribution to other non-yielded members is more dramatic after buckling.
Greatings and many thanks from Finland! Your approach changed my engineering life 😊
Great to hear!
Where do we buy your book?
Regarding the shear friction check you are not double counting the wall rebar because not all is in flexure some portion is in tension and other portion in compression, being accurate the portion in compression could help for shear friction , what do you thing about it? I know many important firms do that
I think I understand what you are asking. The main problem with using any of the wall vertical reinforcing to transfer the diaphragm loads to the shearwall is that the slabs are not thick enough to develop the bars. The best you can argue is that the bar is transferring the diaphragm loads through bearing against them. To truly transfer load from the slab to the wall, the transfer mechanism (the rebar) must be fully engaged (developed) in both elements. For example, in a plywood diaphragm the nail head anchors the nail to the plywood side, but the nail must develop into the plate or the connection between the plywood and the plate won't work. Hopefully I am answering the correct question.
Dirk thank you for a good presentation, could explain where is the Cu factor - Period Parameters Cu - Table 12.8-1.
how can I contact you?
Dirk@SenecaStructural.com
Hello dr.dirk Where is the post tension course 😅 I want to see your course please why did you remove it ?
I have re-released the older 2015 videos. I am currently teaching a worldwide course and they are watching the more recent videos. Thanks for your inquiry.
Thank you very much Professor.
You are very welcome
@@dirkbondy 😊 Yes Sir.
Wow Dirk! Touching personal story about your humble beginnings in engineering through your father. Thanks for sharing!
lol the grouted for communist countries comment
My pleasure!
excelente clase
Thank you very much for this amazing course. Looking forward to watch other courses.
Hello dr.dirk If you please give me your notes because they are very helpful Thanks
Wow 2023 version! this will be awesome again! very helpful for students and practitioners ✍ thank you!
Please can you send post tension institute manual(PTI)
For that you should contact the Post-Tensioning Institute.
Where is your old video professor?
I have deleted the 2015 videos and replaced them with a newer set of videos (2023).
@@dirkbondy Thank you professor. I watched all lecture during my graduate study. Whenever i have free time. I would love to watch this amazing content
Amazing class, Professor Dirk! Congratulations and thank you!
I’ve learned a lot. I hope more structural engineers will look into that column plastic moment demand in relation to the deformation of the building. Do you have a link to where we can download the notes? Many thanks.
Thankyou Doc
Kindly asking for your email address so that I can partake in the homework assignments and the projects. And also have access to your book. This will really change and become a turning point of my structural engineering career. Thank you.
Dirk@SenecaStructural.com
@@dirkbondy Thank you.
Thank you Engineer Dirk Bondy. You’re the best indeed. Great, informative videos especially in this material Prestressed concrete. I did reinforced concrete in college but when I came across your videos I decided to further my knowledge and embark on Prestressed concrete journey with you Mr Dirk, great stuff. Im in love with these lectures.
Thank you kindly!
Can I buy your interesting book
is it possible to get these notes?
www.lulu.com Search "Post-Tensioned Concrete Principles and Practice"
Wow, thankfull Mister. We are engineers, not mathematicians. That is what helped me to feel good 😊
Very nice Sir, know i understood after two year attempting