Finish Right Construction
Finish Right Construction
  • 14
  • 1 546
Columbia 8 inch flat box
applying drywall compound with the 8 inch Columbia flat box
Переглядів: 8

Відео

polishing epoxy floating shelfs
Переглядів 10Місяць тому
working on the final steps of these epoxy shelfs. I'm sanding through 800,1000,1500 and 2000 grit sanding paper before applying a buffing compound to these epoxy floating shelfs
interior painting of a home in Lincoln city oregon
Переглядів 1972 місяці тому
in this video, you will view Finish right construction completing an interior painting project.
m1 advanced mildew treatment
Переглядів 462 місяці тому
in this video you will view finish right construction having sherwin Williams add m-1 mildew treatment to their clients primer
interior painting
Переглядів 4832 місяці тому
in this video you will view us painting interior walls
grouting brick stove backsplash
Переглядів 172 місяці тому
in this video you will view us grouting a brick backsplash. located in Lincoln city oregon
Craftsman style door header
Переглядів 402 місяці тому
in this video we are building and installing a hemlock craftsman style door header above a Dutch exterior door.
brick stove backsplash install. Lincoln city oregon
Переглядів 452 місяці тому
installing brick stove backsplash
Lincoln city oregon exterior painting
Переглядів 262 місяці тому
an exterior painting by a local painting contractor
Tech n9ne at full throttle saloon sturgis sd
Переглядів 3705 років тому
Tech n9ne performing at the full throttle saloon sturgis bike rally 2018
Elevator shaft. commercial drywall installation finish right construction
Переглядів 2755 років тому
Inside of elevator shaft after drywall has Been hung and taped.by finish right construction.
Drywall job
Переглядів 266 років тому
Hanging dry wall, mud tape and texture. For Lincoln county school district