Smart Educare
Smart Educare
  • 237
  • 506 846
ETAP Load Modelling II Lumped Load & Static Load for Load Flow Study
Lumped Load & Static Load modelling need to be done properly in ETAP before simulating the load flow study.
Join this channel to get access to perks:
ua-cam.com/channels/9rzhirCF3CxM7eBEfppALA.htmljoin
ETAP Load Flow Study analysis is done in power system network to check and analyze the active & reactive power flow, bus voltage profile, power factor at different buses etc.
ETAP Load Flow Analysis & Load Analyzer
Load Flow Analysis Using ETAP
How to run a Load Flow Study - Example 2, Part 1
How to perform a Load Flow Calculation with ETAP Software
etap load flow analysis
etap load flow analysis pdf
etap load flow analysis example
load flow analysis using etap
unbalanced load flow analysis etap
purpose of load flow analysis
what is load flow analysis
load flow analysis examples
types of load flow analysis
questions on load flow analysis
etap load flow study
etap load flow
etap load flow study case
load flow etap
how to do load flow analysis in etap
what is lumped load in etap
e load meaning
load flow analysis problems
etap load flow did not converge
load flow analysis in etap
introduction to load flow analysis
load flow analysis of 132 kv substation using etap software
load flow analysis on etap
what is load line analysis
load flow analysis using etap pdf
etap load flow analysis tutorial
why do we need load flow analysis
application of load flow analysis
what is load flow analysis in etap
#loadflow
#analyzer
#etaprojects
Переглядів: 998

Відео

ETAP Load Flow II Power Factor Improvement in Power System II Low Tarif by Utility
Переглядів 6574 місяці тому
Power factor can be improved by adding power factor correction capacitors to the power system network. Analysis is done using ETAP software with different case studies. Join this channel to get access to perks: ua-cam.com/channels/9rzhirCF3CxM7eBEfppALA.htmljoin
Harmonic Filter Sizing using ETAP II Harmonic Analysis
Переглядів 1,3 тис.6 місяців тому
Harmonic Analysis is performed to check the Power Quality considering the harmonic contribution at PCC (Point of Common Coupling) by non-linear sources such as VFD, Battery & Charger, UPS etc. Join this channel to get access to perks: ua-cam.com/channels/9rzhirCF3CxM7eBEfppALA.htmljoin Voltage Harmonic and Current Harmonic need to be checked whether these are within the acceptable limits as spe...
Harmonic Analysis using ETAP - IEEE519 (Part-2)
Переглядів 5706 місяців тому
Harmonic Analysis is performed to check the Power Quality considering the harmonic contribution at PCC (Point of Common Coupling) by non-linear sources such as VFD, Battery & Charger, UPS etc. Join this channel to get access to perks: ua-cam.com/channels/9rzhirCF3CxM7eBEfppALA.htmljoin Voltage Harmonic and Current Harmonic need to be checked whether these are within the acceptable limits as spe...
Harmonic Analysis using ETAP - IEEE519 (Part-1)
Переглядів 1,1 тис.6 місяців тому
Harmonic Analysis is performed to check the Power Quality considering the harmonic contribution at PCC (Point of Common Coupling) by non-linear sources such as VFD, Battery & Charger, UPS etc. Join this channel to get access to perks: ua-cam.com/channels/9rzhirCF3CxM7eBEfppALA.htmljoin Voltage Harmonic and Current Harmonic need to be checked whether these are within the acceptable limits as spe...
ETAP Short Circuit Study II Device Duty & 3 Phase Fault Analysis
Переглядів 1,5 тис.7 місяців тому
Short Circuit Device Duty is performed to choose the selectivity of power system equipment. IEC 60909 is used to perform 3-phase fault, L-G, L-L, L-L-G faults. In this video, the purpose and difference between Device Duty and IEC 60909 faults are explained with the help of ETAP simulation software. Join this channel to get access to perks: ua-cam.com/channels/9rzhirCF3CxM7eBEfppALA.htmljoin Sho...
ETAP Load Flow Analysis II How to Apply Load Diversity Factor
Переглядів 1,6 тис.7 місяців тому
Load Diversity Factor needs to be applied depending on the actual absorbed load in power system network. If the rated connected loads are used to simulate Load Flow study, the actual figure of the load flow or voltage profile or equipment loading such as transformer, cable etc. can not be determined accurately. There are different ways to assign the Load Diversity Factor in ETAP. Loading catego...
IDMT Relay Settings Calculation in ETAP using IEC Formula | Relay trip co ordination
Переглядів 1,5 тис.7 місяців тому
IEC Curves || Normal Inverse (NI) || Very Inverse (VI) || Extremely Inverse (EI) || Long Time Inverse (LTI) IDMT characteristic of protection relay can be used for electrical protection system. IDMT (Inverse Definite Minimum Time) relay characteristic came into the picture in power system protection engineering when only Time grading or Current grading for relay protection co-ordination is not ...
Electrical Conduit Installation II Conduit Embedment कैसे बनाएं ??
Переглядів 2298 місяців тому
Join this channel to get access to perks: ua-cam.com/channels/9rzhirCF3CxM7eBEfppALA.htmljoin #conduit #embedding #conduite
PD Sequence of Operation in ETAP II Phase & Ground Fault Analysis
Переглядів 7759 місяців тому
IDMT characteristic of protection relay can be used for electrical protection system. IDMT (Inverse Definite Minimum Time) relay characteristic came into the picture in power system protection engineering when only Time grading or Current grading for relay protection co-ordination is not enough. Join this channel to get access to perks: ua-cam.com/channels/9rzhirCF3CxM7eBEfppALA.htmljoin This v...
Cable Sizing Calculation II Manual Calculation in MS Excel
Переглядів 2 тис.9 місяців тому
Join this channel to get access to perks: ua-cam.com/channels/9rzhirCF3CxM7eBEfppALA.htmljoin Cable Sizing Calculation criteria are current carrying capacity, voltage drop & short circuit. Cable Sizing Calculation can be performed using ETAP software. Cable sizing calculation| How to select cable size| Electrical Technology and Industrial Practice How to select cable size? AC cable size & Volta...
Cable Sizing Calculation in Excel Spreadsheet
Переглядів 3,5 тис.9 місяців тому
Join this channel to get access to perks: ua-cam.com/channels/9rzhirCF3CxM7eBEfppALA.htmljoin Cable Sizing Calculation criteria are current carrying capacity, voltage drop & short circuit. Cable Sizing Calculation can be performed using Excel spreadsheet. Cable sizing calculation| How to select cable size| Electrical Technology and Industrial Practice How to select cable size? AC cable size & V...
Capacitor Bank Sizing Calculation for Power Factor Improvement
Переглядів 9729 місяців тому
Join this channel to get access to perks: ua-cam.com/channels/9rzhirCF3CxM7eBEfppALA.htmljoin To improve the system power factor in power system network, capacitor can be used. Analysis is done using ETAP software with different case studies. Power factor can be improved by adding power factor correction capacitors to the power system network.
Capitalization Cost Calculation of Transformer Losses
Переглядів 4399 місяців тому
Join this channel to get access to perks: ua-cam.com/channels/9rzhirCF3CxM7eBEfppALA.htmljoin Capitalization Cost Calculation of Transformer Losses transformer impedance transformer impedance calculator typical transformer impedance ieee transformer impedance table three winding transformer impedance transformer impedance formula transformer impedance matching transformer impedance ratio iec tr...
Transformer Rating Selection explained in Excel Spreadsheet
Переглядів 9299 місяців тому
Join this channel to get access to perks: ua-cam.com/channels/9rzhirCF3CxM7eBEfppALA.htmljoin transformer impedance transformer impedance calculator typical transformer impedance ieee transformer impedance table three winding transformer impedance transformer impedance formula transformer impedance matching transformer impedance ratio iec transformer impedance transformer impedance table transf...
Earth Grid Mat Design Calculation in Excel Spreadsheet II Practical Example
Переглядів 7759 місяців тому
Earth Grid Mat Design Calculation in Excel Spreadsheet II Practical Example
How to plot SC MAX MIN in TCC Curve using ETAP II Relay Protection Coordination
Переглядів 11 тис.10 місяців тому
How to plot SC MAX MIN in TCC Curve using ETAP II Relay Protection Coordination
Cable Tray Routing Layout II Explained with Practical Example
Переглядів 2 тис.10 місяців тому
Cable Tray Routing Layout II Explained with Practical Example
Signal Communication with Remote DCS / PLC II How does DI / DO work?
Переглядів 27710 місяців тому
Signal Communication with Remote DCS / PLC II How does DI / DO work?
How to restore Default Data of Components in ETAP Model
Переглядів 51310 місяців тому
How to restore Default Data of Components in ETAP Model
How to model Transformer ONAN & ONAF Rating Impedance in ETAP
Переглядів 78610 місяців тому
How to model Transformer ONAN & ONAF Rating Impedance in ETAP
Cable Size Selection in Power System I Cable Sizing Calculation I Short Circuit Criteria
Переглядів 1,3 тис.10 місяців тому
Cable Size Selection in Power System I Cable Sizing Calculation I Short Circuit Criteria
ETAP Common Error during Motor Starting II Power System Analysis
Переглядів 81710 місяців тому
ETAP Common Error during Motor Starting II Power System Analysis
Transformer Grounding and Vector Group using ETAP
Переглядів 85210 місяців тому
Transformer Grounding and Vector Group using ETAP
Protection Coordination II Protection Stages in IDMT Relay
Переглядів 61911 місяців тому
Protection Coordination II Protection Stages in IDMT Relay
Fault Contribution by Motor to Power System Network analysis using ETAP
Переглядів 96211 місяців тому
Fault Contribution by Motor to Power System Network analysis using ETAP
ETAP System Study II How to Model High Voltage Circuit Breaker in ETAP
Переглядів 1,7 тис.11 місяців тому
ETAP System Study II How to Model High Voltage Circuit Breaker in ETAP
ETAP System Study II How to Model LV Molded Case Circuit Breaker
Переглядів 87511 місяців тому
ETAP System Study II How to Model LV Molded Case Circuit Breaker
Impact of Power Factor in Power System Network using ETAP
Переглядів 41011 місяців тому
Impact of Power Factor in Power System Network using ETAP
ETAP Power System Study II Single Line to Ground Fault Analysis
Переглядів 1,8 тис.11 місяців тому
ETAP Power System Study II Single Line to Ground Fault Analysis

КОМЕНТАРІ

  • @PrateekSrivastava-u9v
    @PrateekSrivastava-u9v 9 годин тому

    please share the excel sheet

  • @ramisiyam2444
    @ramisiyam2444 6 днів тому

    can you please share the excel sheet?

  • @sonipratama6115
    @sonipratama6115 12 днів тому

    i love your content broo keep up the good work

  • @pauloaugusto31
    @pauloaugusto31 16 днів тому

    THANKS! GREETINGS FROM BRAZIL

    • @SmartEducare
      @SmartEducare 16 днів тому

      Thanks a lot for the feedback! Stay tuned..

  • @rakeshchandrapatra2923
    @rakeshchandrapatra2923 17 днів тому

    plz share excell file

  • @youssefshaaban3404
    @youssefshaaban3404 20 днів тому

    Hello Engineer, could you please tell me where I can find the complementary video following the one above?

  • @suryassunshine6469
    @suryassunshine6469 20 днів тому

    Dyn1 transformer cannot be paralleled with Dyn11 transformer. In reality, there will be a phase difference of 10Deg between the voltage of both transformer and this can lead to hug circulating currents if paralleled. ETAP does not give an error or warning for when two transformers with different vector groups are paralleled.

  • @EJAMITONATHANIELMMSU
    @EJAMITONATHANIELMMSU 23 дні тому

    Hello where did you downloaded the catalog for Philips? Thank you

  • @ny-iw9gj
    @ny-iw9gj 28 днів тому

    Thank you very much! It is a very useful video! May I know if the setting in actual case is 4 x 300 / 5A PCT 10P10, what will be the settings in Phase, Neutral, Ground and Sen. Ground in ETAP?

  • @praveenvarma1369
    @praveenvarma1369 29 днів тому

    In case of MV/MV Transformers if there are no MV motors/loads, can we use Delta/Delta Transformers . any disadvantages / advantages?

  • @mwncc6528
    @mwncc6528 29 днів тому

    Sir sorry, I have question in cable sizing. What is the meaning of no of runs? Example: 5R/3.5C/240sqm/XLPE and 1R/3.5C/25sqm/XLPE Thank you Sir

  • @SandeepYADAVggn
    @SandeepYADAVggn Місяць тому

    Irrespective of vector group, load sharing is not showing circulating currents in Etap for vector groups which are not to be operated in parallel. Why? I have tried many transformers with unmacthed vector groups in parallel but in none group etap shows circulating current. Etap simulate normal load sharing for such parallel operation.

  • @ammarbinmaher6183
    @ammarbinmaher6183 Місяць тому

    How did you choose the pick up current 1.05 ? As I know, it suppose to be the normal load current * 1.20 , which is huge. Thanks

  • @jenmatt6699
    @jenmatt6699 Місяць тому

    Email id pls

  • @GrowSelf-i7y
    @GrowSelf-i7y Місяць тому

    You are Gem

  • @biniyamabiy7750
    @biniyamabiy7750 Місяць тому

    How can we get excel

  • @Anaskamal234-r4s
    @Anaskamal234-r4s Місяць тому

    is their anyone who can help me out for the installation of etap

  • @debanjanacharya
    @debanjanacharya Місяць тому

    sir can you please post the link of the video where you have detailed the concept of trip device in low voltage circuit breaker?

  • @sushantakumarsenapati4967
    @sushantakumarsenapati4967 Місяць тому

    Sir, i sent mail query. Please reply

    • @sushantakumarsenapati4967
      @sushantakumarsenapati4967 Місяць тому

      Doubt: 275kV substation: 40kA, 33kV: zigzag transformer earthing of 400A fault limit, LV system: 65kA (TNS system)

    • @sushantakumarsenapati4967
      @sushantakumarsenapati4967 Місяць тому

      What will be the fault current to be considered for ground grid conductor sizing?

  • @kaisalvi7850
    @kaisalvi7850 Місяць тому

    This channel is very extraordinary in explaining, good content also for someone who is still a beginner. he kindly also shared the entire file on this video. hopefully fast growing and successful your youtube channel. PLZ make more useful video and manual calculation (ETAP) SOFTWARE THANKS

    • @SmartEducare
      @SmartEducare 15 днів тому

      Thank you for the kind words and support!

    • @kaisalvi7850
      @kaisalvi7850 10 днів тому

      @@SmartEducare plz continue more video with example etap

  • @beckenbauer1974
    @beckenbauer1974 Місяць тому

    Is there any way to simulate Transient voltage recovery after Generator fault clearance?

  • @sahilbhagat4356
    @sahilbhagat4356 Місяць тому

    Lighting loads or sockets which may or may not be connected to motor shall be considered as static load?

  • @kaisalvi7850
    @kaisalvi7850 Місяць тому

    very nice explained with perfect calculation plz make more etap videos with your projects and also share all excel sheets

  • @ehabshabaan7866
    @ehabshabaan7866 Місяць тому

    Hi , what about the min. gap conductors/phases. And min gap conductors (L-G). Please clarify how we can get the above info

  • @Whitetooth1030
    @Whitetooth1030 2 місяці тому

    Kind of pointless video. Why not explain the reasons for selecting the values you did ? You didn’t explain the pickup range values, curve type, or how to coordinate with existing data.

  • @SXF-ri6rk
    @SXF-ri6rk 2 місяці тому

    Your english is so frightened that I can hear nothing。。。。。。。。。。。

  • @g.r.akashprbhagar9927
    @g.r.akashprbhagar9927 2 місяці тому

    Sir is there any possibilities to run 2 synchronous generators in parallel and connect it to a common bus ?

  • @tanveerulhaq124
    @tanveerulhaq124 2 місяці тому

    Sir Transformer impedance changes with tape position , how to adjust that in etap?

  • @aminhsin855
    @aminhsin855 2 місяці тому

    What fuckn you eating while talking, i lose my temper

  • @MNawfal06
    @MNawfal06 2 місяці тому

    I tried this in my system but when i give fault in bus 4 , relay 3 works first hence cb3 opens then cb4 then cb1 and cb2 Can u tell me where i might have went wrong i did the same as urs

  • @JoakimD1
    @JoakimD1 2 місяці тому

    are you litterly eating an lollipop while talking ? or what the fuck you sucking on?

  • @INTROVERT_GIRL-n7p
    @INTROVERT_GIRL-n7p 2 місяці тому

    Can you send the simulation of this circuit or can you tell where is the video of this simulation because i have to make it for my lab but clearly not understand what components you have used?

  • @abdelmalek9682
    @abdelmalek9682 2 місяці тому

    THANKS MAN! DO YOU HAVE DONE ANY VIDEOS ABOUT HOW TO GREAT DIFFERENT SCENARIO IOS OF THE SAM DIAGRAM ?

    • @SmartEducare
      @SmartEducare 2 місяці тому

      Will make video in detail..

  • @GATTSXX
    @GATTSXX 2 місяці тому

    Its must to but pro version of dailux evo to get these features?

  • @bashiryusuf5215
    @bashiryusuf5215 2 місяці тому

    please am a beginner in dialux evo , Calculation problem Greetings, Awhen I press calculation, nothing happens. I can see the progress bars but there's no progress. I've waited for a few hours and still nothing. When I press cancel the calculation, I get "not responding" error and have to force it to close the program. I've tried to close and restart my computer multiple times, tried to do the calculations with my old work, also tried to reinstall dialux and made sure that the computer is updated correctly, but nothing seems to be working.

  • @khairullatif6890
    @khairullatif6890 2 місяці тому

    Hi sir. How to input leading power factor value at generator sincron on etap. Thanks

  • @ScottMcQuaide-i7n
    @ScottMcQuaide-i7n 2 місяці тому

    Thank you, Could I get a copy of the spreadsheet.

  • @MrOptimusPrime.
    @MrOptimusPrime. 2 місяці тому

    Just dont click everywhere randomly and trash talk. Just give an introduction initially what is the aim and what are you upto... After 3:50 minutes complete trash talk and ahhmmm ahhhmmm and random clicks.

  • @ScottMcQuaide-i7n
    @ScottMcQuaide-i7n 2 місяці тому

    I love you. Thank you so much!

  • @MUHAMMETSALİHTOK
    @MUHAMMETSALİHTOK 2 місяці тому

    Good day sir, I have a question. For example, how can I write a 34.5/0.4 +_12%1.25 transformer into the program? That is, where should I write the +-12% 1.25 values? And where should I write the losses?

  • @jobsebastian94
    @jobsebastian94 2 місяці тому

    Hi Sir, what could be the reason if the "FCT not determined" error still showing against ACB even when the trip device is selected? Please support, Thanks.

  • @Loki-vp4in
    @Loki-vp4in 2 місяці тому

    When I place a fault on any of the downstream busses, it opens the HV CB. It should technically? Thanks.

  • @abdelmalek9682
    @abdelmalek9682 3 місяці тому

    why did you set the secondary pickup to 170 amps ?? i don't get it ?

    • @SmartEducare
      @SmartEducare 2 місяці тому

      Earth fault setting is recommended 10-30% of CT rated current

  • @samandlettie3721
    @samandlettie3721 3 місяці тому

    Ive just worked the calculation for volt drop at 1.777 and not 4 any ideas what ive done wrong could you show the calculation format in the cell

    • @muhammadbinali6223
      @muhammadbinali6223 Місяць тому

      number of runs is 3, he has counted 6, its 3RX3C CABLE

  • @danielocampo725
    @danielocampo725 3 місяці тому

    Hi, Thanks a lot for the info, Greetings from Colombia.

  • @charlesbenwari2327
    @charlesbenwari2327 3 місяці тому

    Please can you share the excel sheet. thanks

  • @manni02
    @manni02 3 місяці тому

    Sir, usually for earth mat design we consider soil resistivity data at depth or spacing of 10meter for determining soil model. What should be the depth or spacing at which resistivity data should be considered please guide and also tell if there are any references in IEEE, for the same. Thanks

  • @ignaciovasquez1601
    @ignaciovasquez1601 3 місяці тому

    Is there any way to clip the current and see more than that current in the curve? I'd like to see the entire curve and the SC levels in one plot without having to add manually the current levels

  • @hanial-shadadi9122
    @hanial-shadadi9122 3 місяці тому

    Why don't discuss the dump load model editor..

  • @Kanmanis_official
    @Kanmanis_official 3 місяці тому

    Please make one video related to support for the Tray routing and Control room cable tray routing? Expect positive reply