A.H.I. Engineering Corporation
A.H.I. Engineering Corporation
  • 93
  • 5 400
Alhamdulillah, the grade beam was cast today At Fusion De Nova (BD) Private Limited.Tongi Gazipur.
Alhamdulillah, the grade beam was cast today At Fusion De Nova (BD) Private Limited.Tongi Gazipur.
Переглядів: 51

Відео

Erection Anchor Bolts For Steel Structure.
Переглядів 18Місяць тому
Erection Anchor Bolts For Steel Structure At Fusion De Nova (BD) Private Limited. Tongi Gazipur.
A.H.I.Engineering Corporation. Mirpur, Dhaka.
Переглядів 593 місяці тому
Alhamdulillah by Allah's grace I installed the new panel board of five water pumps with two VFDs properly and securely and connected the new panel with the Star Delta powered control panel. Currently the panel is running in local mode and remote mode.
A.H.I.Engineering Corporation.
Переглядів 343 місяці тому
VFD Panel Board Installation, Cableing With Connection Infinia Textile Ltd,Infinia Group,Kadam Rasul,Chittagong.
A.H.I.Engineering Corporation.
Переглядів 243 місяці тому
Complete Electronic Circuit DC Driver for Solar panels Cleaning Robot. Best Solar Bangladesh.
British American Tobacco. BAT Bangladesh.
Переглядів 1114 місяці тому
After Installation a new Main distribution Panel Board, Connect all the power cables from the old Main distribution Panel Board and check that the power cables are properly connected to the new Main distribution Panel Board. BAT Bangladesh.
A.H.I.Engineering Corporation.
Переглядів 894 місяці тому
Various types of panels including HT Panel, LT Panel, PFI,Auto Change Over Panel, Main distribution Board, Sub distribution board are manufactured by skilled engineers and technicians from the workshop of A.H.I.Engineering Corporation & all necessary electrical components are Installation properly. power Cable Wiring With Control Wiring is tested and handed over to customer within proper time.
Control system is Testing before handing over the Control Panel to the customer. Infinia Textile Ltd
Переглядів 1004 місяці тому
All electrical components of the Utility Control Panel With two VFD of 37 kw are properly installed. And power Cable Wiring Complete with Control Wiring. Control system is Testing before handing over the Control Panel to the customer. Infinia Textile Ltd,Infinia Group,Kadam Rasul,Chittagong.
Alhamdulillah I Started a new project by the grace of Allah.
Переглядів 1384 місяці тому
Alhamdulillah I Started a new project by the grace of Allah. I Started the civil work to construct the steel building. Fusion De Nova (BD) Private Limited. Hyderabad, Pubali, Gazipur, Sadar.
Installation of all Electrical Components of Utility Control Panel With 37 KW VFD.
Переглядів 544 місяці тому
Installation of all Electrical Components of Utility Control Panel With 37 KW VFD Including Control Wiring & Power Cable Connection. Infinia Textile Ltd,Infinia Group,Kadam Rasul,Chittagong.
37 KW VFD With Utility Panel Board Assembling.
Переглядів 1625 місяців тому
37 KW VFD With Utility Panel Board Assembling. Infinia Textile Ltd,Infinia Group,Kadam Rasul,Chittagong.
Checking that the size & number of cables, and Motor Capacity are correct.
Переглядів 195 місяців тому
Checking that the size & number of cables, and Motor Capacity are correct as per the AC Palant drawing. Infinia Textile Ltd,Infinia Group,Kadam Rasul,Chittagong.
Power Cable 600 rm is connected to 1000 amp circuit breaker of main distribution Panel.
Переглядів 575 місяців тому
Power Cable 600 rm is connected to 1000 amp circuit breaker of main distribution Panel for all Control panels of AC Palant. Infinia Textile Ltd,Infinia Group,Kadam Rasul,Chittagong.
Connecting power cables to all Control panels of AC Palant.
Переглядів 315 місяців тому
Power Cable Testing of all Control panels of AC Palant, Cable Socket Punch,Cable Connection including cabling.Infin Textile Ltd,Infinia Group,Kadam Rasul,Chittagong.
2 Megawatt Solar Power plant.
Переглядів 385 місяців тому
2 Megawatt Solar Power Plant has robotic machine for cleaning solar panels.The Robot Was broken.Again the robot is maintenance and commissioned.
Supply fan motor of AC Palant is 110 Kw star delta Connection.
Переглядів 695 місяців тому
Supply fan motor of AC Palant is 110 Kw star delta Connection.
PLC Control Cable Testing, Cable Laying With Numbering.I
Переглядів 185 місяців тому
PLC Control Cable Testing, Cable Laying With Numbering.I
Today plc Panel modification for heater automation.
Переглядів 585 місяців тому
Today plc Panel modification for heater automation.
Today I Started Trial AC Palant Infinia Textile Ltd,Infinia Group,Kadam Rasul,Chittagong.
Переглядів 242Рік тому
Today I Started Trial AC Palant Infinia Textile Ltd,Infinia Group,Kadam Rasul,Chittagong.
I checked All Control cables of AC Palant and piping with Numbering.
Переглядів 112Рік тому
I checked All Control cables of AC Palant and piping with Numbering.
AC Palant All Control Cable Testing, Cabling With Numbering &Piping.
Переглядів 39Рік тому
AC Palant All Control Cable Testing, Cabling With Numbering &Piping.
Alhamdulillah, by the grace of Allah, I finished the work of all the peas correctly and safely.
Переглядів 81Рік тому
Alhamdulillah, by the grace of Allah, I finished the work of all the peas correctly and safely.
All Motor Connections of Ac Palant are fully connected now Motor Connections are being Checked.
Переглядів 71Рік тому
All Motor Connections of Ac Palant are fully connected now Motor Connections are being Checked.
AC Palant All Servo Motor Connection Cable Numbering.
Переглядів 21Рік тому
AC Palant All Servo Motor Connection Cable Numbering.
AC Palant All Motor Cable & Control Cable Numbering.
Переглядів 30Рік тому
AC Palant All Motor Cable & Control Cable Numbering.
AC Palant 100 kw Heater Cable Connection With 100 kw & 90 kw Motor Connection Metering.
Переглядів 30Рік тому
AC Palant 100 kw Heater Cable Connection With 100 kw & 90 kw Motor Connection Metering.
Ac Palant Motor Connection With Control Cable Connection.
Переглядів 53Рік тому
Ac Palant Motor Connection With Control Cable Connection.
AC Palant 37 kw Motor, 30 kw Motor, 22 kw Motor Connection Complete Check All Motor Connection.
Переглядів 18Рік тому
AC Palant 37 kw Motor, 30 kw Motor, 22 kw Motor Connection Complete Check All Motor Connection.
AC Palant 100 kw Motor Testing With Servo motor Connection.
Переглядів 61Рік тому
AC Palant 100 kw Motor Testing With Servo motor Connection.
AC Palant Control Cable Testing With Connection.
Переглядів 26Рік тому
AC Palant Control Cable Testing With Connection.

КОМЕНТАРІ