Study Of Elevators,Testing Elevators.Procedure of Load Balancing or Overload Testing Of Elevator.
In this video i try to share basic Concept of Elevator Load balancing and Overload testing.
this is basic way for overload testing.
now a days many Elevators brands Available all Elevator company have different Procedure but concept is same. only difference is Some Elevator Brands have Personal programming setting for Zero load Balancing, and Overload setting
Переглядів: 232

Відео

Elevator Testing Commissioning, Inspection, Normal Operatio Procedure with Study Of Elevator
Переглядів 6962 роки тому
Elevator Testing Commissioning, Inspection, Normal Operatio Procedure with Study Of Elevator
After Mechanical Work, Electrical Work, and Electrical Start up and Elevator Testing Commissioning
Переглядів 5302 роки тому
After Mechanical Work, Electrical Work, and Electrical Start up and Elevator Testing Commissioning
Study of Elevator Installation, Rail Hoisting, Bracket Alignment, Guid Rail Alignment.
Переглядів 1,1 тис.2 роки тому
I am making video on basic Elevator Installation processes. if You undustand this, You can install defferent types of Elevator. Raffe. Video for Dimension 1. ua-cam.com/video/DWANL4mbiHs/v-deo.html
Elevator Entrance Installation, Alignment, Door installation and Adjustment
Переглядів 6732 роки тому
Elevator Entrance Installation, Alignment, Door installation and Adjustment
How to Set Template, How to Calculate Plumb Distanace# Study Of Elevator
Переглядів 17 тис.2 роки тому
Template Setting - ELEVATOR/ LIFT This time we are discussing elevator template which is the first part of elevator installation If you come across any doubt please comment below. This will help us to post your question's solution. TEMPLATE is the heart of elevator installation. This is the guideline for the full installation process.A template is a framework which is made of wood or steel pipe...
See How to make Elevator Template, Template Marking, Template Drawing reading.
Переглядів 10 тис.3 роки тому
Template Setting - ELEVATOR/ LIFT This time we are discussing elevator template which is the first part of elevator installation If you come across any doubt please comment below. This will help us to post your question's solution. TEMPLATE is the heart of elevator installation. This is the guideline for the full installation process.A template is a framework which is made of wood or steel pipe...
Study Of Elevator, Site activities, Site work plan.
Переглядів 5273 роки тому
Hello Friend's I am Akshay Today i am going to share first Activity on site before start Elevator work. Now a day's Elevator manufacturing and Installation companies are doing more development in elevator field. Also all Elevator comapnies have Defferent models as well as defferrent work procedure but some work is same in all companies. Following activities is common in all Elevator company. Th...