- 3
- 12 071
Seajacks UK Ltd
Приєднався 16 тра 2014
Seajacks Scylla sea trial footage
Seajacks Scylla undertaking sea trials from Samsung Heavy Industries in South Korea
Переглядів: 5 679
Відео
Seajacks Kraken working for Shell UK & NAM
Переглядів 1,4 тис.8 років тому
Seajacks Kraken embarked on a 2 year well intervention campaign in the Southern North Sea
Seajacks Meerwind Project
Переглядів 5 тис.8 років тому
Seajacks Leviathan and Zaratan working together to install all components of Meerwind Offshore Wind Park
In this earth no one can calculate the paticals and the nature's oxygen into the air excertly at all; the oxygen is including of seas water how and the coldest killing the oxygen without times and how fast can get aging as whites loves the coldest snow weather's the aging times is almost over 1000th seconds fastest; therefore, when you got oldest then the humans didnt calculate internal bodies degeneration how fast that plastics surgeries couldn't helping you covered the oldest aging; only set and waiting to dies with no life's incapable movements.
The Gold isnt the most valuable on earth; instead, the diamonds is most highest energies special the colors one from the volcanoes.
I was the commissioning engineer for her 1500mT leg encircling crane in Geoje, South-Korea 🙂
I like working in sea Jack
Interested for HeavyLift Crane Opt email id: budhicrane@gmail.com
The sizes of these offshore windmills always amaze me. I have some questions about this work:How long did it take to load the Monopiles and Transition pieces on deck?And how long takes the installation process of the Monopiles and Transition pieces?I'm really looking forward for you reply and I thank you in advance.