ELECTRICAL TAFE theory
ELECTRICAL TAFE theory
  • 78
  • 177 535

Відео

testing installation with trailing lead explained to swp how we would test with it
Переглядів 5613 місяці тому
This video talks about how we use a training lead with regards to the swp and also how you would use it in testing of an installation and we've also had to go through it with a slightly different look at how we do the tests
swp trailing lead explained in simple way
Переглядів 3443 місяці тому
I try to put Lloyd on how we use the testing lead and how it should be zeroed out and done just to put at ease how some people look at it or how they're taught. If there's any problems with this video please let me know
testing of installation 2024
Переглядів 4,2 тис.4 місяці тому
Testing of domestic installation
LET PAPER overload and short-circuit calculations
Переглядів 3686 місяців тому
Short video on how to work out the calculations and how to set them out to get full marks
LET cable selection based on a maximum demand with deratings
Переглядів 7966 місяців тому
LET cable selection based on a maximum demand with deratings
LET cable selection based on cable size
Переглядів 6436 місяців тому
this video I made to show the difference between maximum demand and size of cable in a in a cable selection. question for the LET just to give you that difference in what you need to do
MAXIMUM DEMAND TABLE C1 EXPLAINED STEP BY STEP part 1
Переглядів 2,4 тис.7 місяців тому
table C1 explains step by step with worked examples to show you how it works and explain how you would get your answer. this is part one
cable selection 3008 index B1 and tables explained
Переглядів 1 тис.8 місяців тому
you sweetie how you guys show you how to use cable selection in 3008 book and shows you how the tables are broken down
E104 fix and drill s
Переглядів 4632 роки тому
E104 fix and drill s
OCB explained part 2
Переглядів 4262 роки тому
simple description of how the control wiring works and how the acb fits into the rack and does it's job
OCB explained compared to a contactor 22 000 v
Переглядів 2782 роки тому
basic description of a OCB oil circuit breaker describe compared to contactor
testing of an electrical installation
Переглядів 3,7 тис.2 роки тому
Video from Steven
TEST OF ELECTRICAL INSTALLATION CHISHOLM
Переглядів 9 тис.2 роки тому
Testing of electrical installation at Chisholm LET room
Steve's test run on insulation testing
Переглядів 2,2 тис.2 роки тому
Steve's test run on insulation testing
dc circuits explained no 6
Переглядів 1,7 тис.3 роки тому
dc circuits explained no 6
AC 3 Phase Motor Basics Simplified
Переглядів 4993 роки тому
AC 3 Phase Motor Basics Simplified
g109a control box with multi stage start up
Переглядів 3053 роки тому
g109a control box with multi stage start up
LET voltage drop Explained one of questions
Переглядів 6 тис.4 роки тому
LET voltage drop Explained one of questions
overload and short circuit calculation LET exam fault current
Переглядів 4,8 тис.4 роки тому
overload and short circuit calculation LET exam fault current
dc circuits explained LET
Переглядів 1,8 тис.4 роки тому
dc circuits explained LET
let paper is lay out
Переглядів 1,8 тис.4 роки тому
let paper is lay out
dc circuits step by step no1
Переглядів 1,9 тис.4 роки тому
dc circuits step by step no1
dc circuits explained no 2
Переглядів 1,1 тис.4 роки тому
dc circuits explained no 2
dc circuits explained no 3
Переглядів 6074 роки тому
dc circuits explained no 3
dc circuits explained no 4
Переглядів 5364 роки тому
dc circuits explained no 4
dc circuits explained no 5
Переглядів 8824 роки тому
dc circuits explained no 5
How to cutaway a 3 phase motor
Переглядів 4884 роки тому
How to cutaway a 3 phase motor
g103 wiring task
Переглядів 6864 роки тому
g103 wiring task
3008 tables 22 and 25 /1 and 25/2 how they work
Переглядів 8464 роки тому
3008 tables 22 and 25 /1 and 25/2 how they work

КОМЕНТАРІ

  • @giauscaesar8047
    @giauscaesar8047 2 місяці тому

    Nice lecture thank you.

  • @2ndprojects
    @2ndprojects 3 місяці тому

    Hi mate, why is cable only buried in Australia 0.5m?

    • @HDXFH
      @HDXFH Місяць тому

      Thats the standard

  • @TERIYAKI682
    @TERIYAKI682 3 місяці тому

    It’s 2024 and prepping for my Regs exam and this video has helped a lot

  • @bennydoesstuff407
    @bennydoesstuff407 3 місяці тому

    Steve helped me so much. What a legend. I hope he is doing well.

  • @ryanq1273
    @ryanq1273 4 місяці тому

    Thanks mate

  • @johntamrang9139
    @johntamrang9139 4 місяці тому

    please can you send me your email address. I want to discuss something with you

  • @joaopaulodeoliveiramoreira8949
    @joaopaulodeoliveiramoreira8949 5 місяців тому

    Amazing video! I've sent you an invite on LinkedIn, because im looking for some exercises about Maximum demand, CCC and voltage drop, this is because I'm a junior Electrical Engineer and I'm looking for more expircience in the construction. Can we talk ? Im will appreciate a lot! You are doing an amazing job!

  • @brianfirth5435
    @brianfirth5435 6 місяців тому

    You know the subject obviously. But what a lot of waffle, not very well delivered.

  • @stavrikvelos5074
    @stavrikvelos5074 6 місяців тому

    Very nice, maximum demand is the total amount of power required on the sub board as per AS3000, circuit breakers are there for cable circuit protection in case of an overload or a short circuit on the line. Also I believe there is half a module space required between the main switch and the first circuit breaker incase of sealing purposes.

  • @JANEYZANEY
    @JANEYZANEY 7 місяців тому

    cheers for vid, makes sense

  • @HDXFH
    @HDXFH 7 місяців тому

    Cinder block or besser or millblocks

  • @HDXFH
    @HDXFH 7 місяців тому

    Resistivity

  • @ifell3
    @ifell3 7 місяців тому

    Should the MEN link be thick, least resistance or thinner making a higher resistance? I'm thinking thicker so the current can pass through quicker and the resistance of the other metals in the housing will allow for that 5 or 10 ms delay. Am I correct?

    • @stonedsloth6367
      @stonedsloth6367 6 місяців тому

      that depends on on the wiring rules. A dummy value is having it the same csa as the neutral conductor, but there are variations to consider in varying the size. theres also a rule stating a conductive enclosure needs bonding equivalent to that of the neutral conductor. Imagine seeing a 16mm2 bond on a domestic board wtf hahah. But like i said there are variations to factor in that can either increase that size or decrease.

  • @bdsipos
    @bdsipos 7 місяців тому

    Did you understand what he was getting at?

  • @HDXFH
    @HDXFH 7 місяців тому

    I found it confusing as well

  • @martindekker8203
    @martindekker8203 8 місяців тому

    You would only have the earth to neutral link attached on your main board though. Not on any sub boards. correct?

  • @habibmalass6896
    @habibmalass6896 9 місяців тому

    I just moved to Australia and I noticed that the diversity factors between each apartments, at the consumer level, at the transformers level, between floors,... are not considered? or probably these tables are already diversified max demand? appreciate if you have an answer. As this will reduce heavily the MD for each assessment.

    • @habibmalass6896
      @habibmalass6896 9 місяців тому

      Internationally we refer to the Standard Handbook for Electrical engineers - Mcgraw Hill

  • @dalescott4570
    @dalescott4570 9 місяців тому

    Thank you. Very easy to understand info. But i have a further question. In an off grid system (solar with lightning protection+inverter+generator) where does this link go? Do they all run to the same earth? Is there a way to separate the earths so that lightning or static electricity does not upset the rcd function? Is that even an issue? There is a real lack of info on this subject. Maybe im just looking in the wrong place?

  • @genesismarsh-potini4153
    @genesismarsh-potini4153 10 місяців тому

    Why is it “multiple” why can you only have one

    • @unSTEVOED
      @unSTEVOED 4 місяці тому

      It’s called Multiple Earthed Neutral because the (P.E.N) Neutral is Earthed at the Installation (Main SwitchBoard), and throughout the distribution system (Poles and Transformers)

  • @HimanshuThapa-c5s
    @HimanshuThapa-c5s 10 місяців тому

    Thanks for the video, bery helpful.

  • @MagnificentVillain
    @MagnificentVillain 11 місяців тому

    Thanks for explanation.

  • @rmetvmasterelectrician9330
    @rmetvmasterelectrician9330 11 місяців тому

    This series parallel circuit?

  • @troyotapreuis6020
    @troyotapreuis6020 Рік тому

    15years ago my TAFE lecture did not explain it like this at all. Such a shame this part of an apprentice the lecture brushed over this swiftly. Your explanation shows how important it is and all under 30mins which was also very clear and precise. Thanks 🙏

  • @ronaldmark100
    @ronaldmark100 Рік тому

    Will it be logical and Safe to use Table C9 to separate the loads per Circuit Breaker first and then Calculate the Maximum Demand accordingly if I'm sizing a Maximum Demand for a Final Subcircuit?

  • @ronaldmark100
    @ronaldmark100 Рік тому

    Hi Sir, If I have 2 x 20Amps + 2 x 32Amps 3-phase socket outlets in a Factory, how do I calculate the maximum demand. Does it fall under load group b(iii)?

  • @nathandebono3284
    @nathandebono3284 Рік тому

    hello would i be able to get some assistance with a certain max demand question i have regarding single phase lighting circuit on a 3 phase switch board if possible, could i please email you?

  • @jermainaisa9223
    @jermainaisa9223 Рік тому

    U used 5 units as example to explain column four....

  • @menakagamagedara2227
    @menakagamagedara2227 Рік тому

    Very helpful, Steve.

  • @johnnyambi550
    @johnnyambi550 Рік тому

    During earth fault condition if nuetral is connected to earthing bar would the current not be of shock harzad

  • @aaronr5555
    @aaronr5555 Рік тому

    Ummm m.e.n doesn’t stand for main earth neutral 🤪

  • @watahead91
    @watahead91 Рік тому

    I don’t understand, if I’m installing 3 extra 10Amp double gpos in a room of a domestic house do I have to calculate maximum demand?

  • @mosessillih2525
    @mosessillih2525 Рік тому

    Hi sir so I came across this non- domestic max/demand load. (1) 30 - 2×36W fluorescent fittings @0.38A each. I know it will be in load group (a) but the calculation part I'm a little bit confuse. If you could at least explain what they meant. Thankyou

  • @Didgeridootrio
    @Didgeridootrio Рік тому

    "Do you understand what I'm getting at"?

  • @thomj........
    @thomj........ Рік тому

    Can you steady the fucking camera and stop shaking it please

  • @cheekynandos5706
    @cheekynandos5706 Рік тому

    Take a shot everytime you hear "you understand what I'm getting at? "

  • @mogatocanberra5900
    @mogatocanberra5900 Рік тому

    Hi, Pls help me with this. When it says 2 core cable, is it active and neutral? Thanks Sir.

  • @michaelhand5302
    @michaelhand5302 Рік тому

    i stumbled across your content for the LET a couple of weeks ago, and all i can say is thank you!, did it today and passed!

    • @stonedsloth6367
      @stonedsloth6367 Рік тому

      I am shitting bricks mate. The stress is real... I think I may have developed some form of depression.

    • @michaelhand5302
      @michaelhand5302 Рік тому

      @@stonedsloth6367 Keep studying man, took me a while to understand some things, but in the end the exams were not so bad and ended up doing really well

  • @davoc5140
    @davoc5140 Рік тому

    hmmm not the best at explaining

  • @minabenjamin3660
    @minabenjamin3660 2 роки тому

    This video helped me a lot today, thanks a lot mate - appreciate the effort!

  • @peicao8137
    @peicao8137 2 роки тому

    🎉🎉🎉🎉🎉🎉😢🎉

  • @peicao8137
    @peicao8137 2 роки тому

    Nice 🎉

  • @tahaali3603
    @tahaali3603 2 роки тому

    thanks alot

  • @nicholasmancinii
    @nicholasmancinii 2 роки тому

    Found your channel last week and its the most informative and clear channel ive found in prep for my A grade tests. In your latest video on Wiring rule questions I can't see a link, I'm not sure if it is only for your students but would love to have access to it, I am at swinburne and they dont and explain anything as clear as you do.

  • @petergolias7265
    @petergolias7265 2 роки тому

    When using RCBO for final sub-circuits, do we connect M.E.N in the sub-board?

  • @petergolias7265
    @petergolias7265 2 роки тому

    Thank you So much Sir .

  • @johnkaisin8887
    @johnkaisin8887 2 роки тому

    The MEN (Multiple Earthed Neutral)

  • @aliozkan5200
    @aliozkan5200 2 роки тому

    thanks for the videos mate. really helps a lot cheers.

  • @michaelcostello6991
    @michaelcostello6991 2 роки тому

    Are the cable impedance values for the line and neutral ? ie Do they allow for the length of the neutral return path also ? Is the short circuit value for phase to phase short which is the worst case scenario i assume. ?

  • @johnhannaway5182
    @johnhannaway5182 2 роки тому

    I’ve been in the trade a long time, this is the easiest to understand explanation I have seen. Well done

  • @donnelly.1969
    @donnelly.1969 2 роки тому

    if the MEN Link is missing is it a serious problem