- 153
- 1 811 809
Federal Roads Office FEDRO (Switzerland)
Switzerland
Приєднався 31 сер 2016
The Federal Roads Office (FEDRO) was established in 1998 as Switzerland's federal authority responsible for road infrastructure and private road transport.
Sistema di limitazione dinamica della velocità e segnalazione pericoli - video esplicativo
I risultati di analisi e sperimentazioni sul campo con dati reali dimostrano che un tratto autostradale raggiunge la sua capacità massima quando i veicoli circolano a una velocità di circa 85 km/h. Abbassando progressivamente la velocità massima consentita da 120 a 100 o 80 km/h è possibile ridurre le differenze di andatura fra i veicoli e rendere più uniforme e scorrevole la circolazione su un determinato tratto. Oltre ad aumentare la sicurezza, questa misura contribuisce a ritardare la formazione di code e a contenere gli ingorghi in generale.
Переглядів: 447
Відео
Harmonisation des vitesses et avertissement de danger - vidéo explicative
Переглядів 332Місяць тому
Les résultats de la recherche et les connaissances du terrain montrent qu’un tronçon d’autoroute atteint sa capacité maximale lorsque les véhicules y circulent à une vitesse d’environ 85 km/h. Abaisser progressivement la vitesse maximale autorisée de 120 à 100, voire 80 km/h, permet de réduire les différences de vitesse entre les véhicules et d’harmoniser (et donc d’optimiser) le flux de la cir...
A15 Uster-Hinwil, Lückenschliessung Oberlandautobahn
Переглядів 3,4 тис.Місяць тому
Video erklärt, wo und warum die Lückenschliessung stattfindet und weshalb sich die Linienführung anspruchsvoll gestaltet. Dazu Luftaufnahmen des von der Lückenschliessung betroffenen Gebiets mit Aufnahmen von verschiedenen neuralgischen Stellen der N15, die sich innerorts durch die Gemeinde Wetzikon zieht und reichlich Verkehr in die Gemeinde bringt. Dazu Aufnahmen vom Betzholzkreisel, Anschlus...
So wird die Betriebs- und Sicherheitsausrüstung im neuen Tunnel Schöneich getestet
Переглядів 1,8 тис.2 місяці тому
Im Sommer 2024 wurde im Schöneichtunnel die neue Betriebs- und Sicherheitsausrüstung, kurz BSA, umfassend und wirklichkeitsnah getestet. Das Video dieser nachts durchgeführten Tests veranschaulicht, wie die Warnsensorik und die Entlüftungsanlage getestet werden und wie diese im Ernstfall bei einem Tunnelbrand funktionieren würden.
A1 Wankdorf Schönbühl Visualisierung
Переглядів 2,7 тис.2 місяці тому
Die Nationalstrassen haben eine wichtige Funktion für das Schweizer Verkehrssystem. Damit Sie diese auch künftig wahrnehmen können, sieht das nationale Strategische Entwicklungsprogramm Nationalstrassen STEP neben verschiedenen anderen Massnahmen auch punktuelle Ausbauten vor. Eines der betroffenen Teilstücke liegt zwischen den Anschlüssen Bern-Wankdorf und Schönbühl. Der Bundesrat hat das gene...
A2 Semisvincolo Bellinzona utilizzo della rotonda
Переглядів 5 тис.2 місяці тому
Il Semisvincolo autostradale di Bellinzona Centro è una rotonda a doppie corsie separate che comporta dei cambiamenti significativi per il traffico in entrata e uscita della città. L’obiettivo principale di questa infrastruttura è separare i veicoli con destinazione diverse grazie a corsie di scorrimento alternativo, riducendo così le interferenze tra i vari flussi di traffico all’interno della...
Jürg Röthlisberger, direttore dell'USTRA, presenta la Roadmap Velo
Переглядів 1083 місяці тому
Jürg Röthlisberger, direttore dell'USTRA, presenta il progetto e gli obiettivi della Roadmap Velo. Spiega come il progetto "Roadmap Velo" venga portato avanti in collaborazione con diversi stakeholder, autorità, cantoni e comuni e quale significato abbia per il " sistema ciclabile". L'obiettivo della piattaforma www.roadmapvelo.ch è quello di creare un luogo centrale in cui trovare ispirazione ...
Jürg Röthlisberger, directeur de l'OFROU, présente la Roadmap Velo
Переглядів 923 місяці тому
Jürg Röthlisberger, directeur de l'OFROU, présente le projet et les objectifs de la Roadmap Velo. Il explique comment on fait avancer le projet « Roadmap Velo » en collaboration avec différents acteurs, offices, cantons et communes et quelle est son importance pour le « système vélo". Avec la plateforme www.roadmapvelo.ch, on souhaite créer un lieu central où les gens peuvent s'inspirer et s'in...
ASTRA-Direktor Jürg Röthlisberger präsentiert die Roadmap Velo
Переглядів 3523 місяці тому
Jürg Röthlisberger, Direktor des ASTRA, stellt das Vorhaben und die Ziele der Roadmap Velo vor. Er erläutert, wie man in Zusammenarbeit mit verschiedenen Akteurinnen und Akteuren sowie Ämtern, Kantonen und Gemeinden das Projekt «Roadmap Velo» vorantreibt und welche Bedeutung es für das «System Velo» hat. Mit der Plattform www.roadmapvelo.ch möchte man einen zentralen Ort schaffen, an dem sich d...
A2 Semisvincolo Bellinzona: posa della carpenteria metallica
Переглядів 9543 місяці тому
Dopo la recente apertura del nuovo ponte lungo via Tatti da parte del Dipartimento delle costruzioni del Canton Ticino, nel corso del prossimo mese di settembre verranno aperte le due rampe autostradali che collegheranno la nuova rotonda alla A2 (da e per sud). I lavori di costruzione del semisvincolo di Bellinzona erano iniziati nel 2022, nel mese di marzo 2022 è iniziata la realizzazione del ...
Eine Nacht auf der A1: Hinter den Kulissen der Sanierungen auf der Stadtautobahn St. Gallen
Переглядів 8 тис.3 місяці тому
Das Projekt «A1 Instandsetzung Stadtautobahn St. Gallen» umfasst die Sanierung der knapp 10 Kilometer langen Strecke zwischen SG-Winkeln und SG-Neudorf bis und mit 2027. Begleiten Sie uns bei einer nächtlichen Erkundung der Bauarbeiten.
Verschiebung ASTRA Bridge in der Nacht
Переглядів 15 тис.5 місяців тому
Unten bauen, oben fahren: Das verspricht die ASTRA Bridge! Doch wie wird die mobile Baustellenbrücke verschoben? Werfen Sie einen Blick hinter die Kulissen des nächtlichen Einsatzes zur Verschiebung der ASTRA Bridge.
Montage von Querträgern auf der A2
Переглядів 7345 місяців тому
Auf der A2 wird zwischen Beckenried und Hergiswil eine Anlage zur Geschwindigkeitsharmonisierung und Gefahrenwarnung - kurz GHGW-Anlage - installiert. Werfen Sie einen Blick hinter die Kulissen und sehen Sie in diesem Video, wie ein dafür benötigter Querträger über der Autobahn montiert wird.
Second Gotthard road tunnel on the A2 - the most important information at a glance
Переглядів 1,4 тис.6 місяців тому
The Gotthard road tunnel has been in operation since 1980, serving as a national road link between Göschenen in the canton of Uri and Airolo in the canton of Ticino. To ensure the functionality and safety of this key Alpine transport axis, a complete renovation of the first road tunnel is essential, meaning a full closure will be unavoidable. In 2012, the Federal Council decided in favour of bu...
A2 secondo tubo San Gottardo - I fatti più importanti
Переглядів 1,1 тис.6 місяців тому
Dal 1980 la galleria stradale del San Gottardo funge da collegamento come strada nazionale tra Göschenen nel Cantone di Uri e Airolo nel Cantone Ticino. Per garantire la funzionalità e la sicurezza di questo importante asse di traffico attraverso le Alpi, è necessaria una manutenzione integrale del primo tubo, che richiede una chiusura completa. Nel 2012, il Consiglio federale ha deciso di cost...
A2 Second tube du Saint-Gothard - L’essentiel en bref
Переглядів 5786 місяців тому
A2 Second tube du Saint-Gothard - L’essentiel en bref
A2 Zweite Röhre Gotthard - Das Wichtigste in Kürze
Переглядів 74 тис.6 місяців тому
A2 Zweite Röhre Gotthard - Das Wichtigste in Kürze
ASTRA Bridge Aufbau - Blick hinter die Kulissen
Переглядів 170 тис.6 місяців тому
ASTRA Bridge Aufbau - Blick hinter die Kulissen
Seismic isolation as a technique for the seismic evaluation and retrofit of Swiss highway bridges
Переглядів 2189 місяців тому
Seismic isolation as a technique for the seismic evaluation and retrofit of Swiss highway bridges
Gelungene Testfahrten über die optimierte ASTRA Bridge
Переглядів 13 тис.9 місяців тому
Gelungene Testfahrten über die optimierte ASTRA Bridge
A2 Semisvincolo Bellinzona: traslazione e demolizione ponte Via Tatti
Переглядів 2 тис.10 місяців тому
A2 Semisvincolo Bellinzona: traslazione e demolizione ponte Via Tatti
A2 Second Gotthard Road Tunnel: Complex material logistics
Переглядів 29110 місяців тому
A2 Second Gotthard Road Tunnel: Complex material logistics
A2 Secondo tubo San Gottardo: Gestione del materiale impegnativa
Переглядів 74210 місяців тому
A2 Secondo tubo San Gottardo: Gestione del materiale impegnativa
A2 Zweite Röhre Gotthard: Komplexe Materiallogistik
Переглядів 1,6 тис.10 місяців тому
A2 Zweite Röhre Gotthard: Komplexe Materiallogistik
A2 Second tube du Saint-Gothard : Gestion de matériaux complexe
Переглядів 20110 місяців тому
A2 Second tube du Saint-Gothard : Gestion de matériaux complexe
Armatures résistantes à la corrosion
Переглядів 16811 місяців тому
Armatures résistantes à la corrosion
Korrosionsbeständige Bewehrung - Chancen, Risiken, Anwendungsfälle
Переглядів 23811 місяців тому
Korrosionsbeständige Bewehrung - Chancen, Risiken, Anwendungsfälle
As a Swiss / US Civil Engineer working in the US and Canada on large infrastructure project, I am not supporting this temporary work system as it is overengineered and not time and cost effective. I am recommending medium scale for a section of 5 km roadway reconstruction and new pavement or surface maintenance the traditional construction way. Today we have worldwide experience in the construction of roadways and various paving selections. Good equipment like John Deere (Voegele) Caterpillar and Dynapac is available for any size of new or maintenance roadwork. Traffic control can be managed with detours and or temporary full or limited lane / road closures. The key for a successful workexecution is planning and engineering to the details. Japanese engineers and contractors are the very best examples for study proper work preparation and quality execution. Further I am recommending onsite dedicated mobile crushers and asphalts hot-mix and concrete batch plants.
As a Swiss / US Civil Engineer working in the US and Canada on large infrastructure project, I am not supporting this temporary work system as it is overengineered and not time and cost effective. I am recommending medium scale for a section of 5 km roadway reconstruction and new pavement or surface maintenance the traditional construction way. Today we have worldwide experience in the construction of roadways and various paving selections. Good equipment like John Deere (Voegele) Caterpillar and Dynapac is available for any size of new or maintenance roadwork. Traffic control can be managed with detours and or temporary full or limited lane / road closures. The key for a successful workexecution is planning and engineering to the details. Japanese engineers and contractors are the very best examples for study proper work preparation and quality execution. Further I am recommending onsite dedicated mobile crushers and asphalts hot-mix and concrete batch plants.
As a Swiss / US Civil Engineer working in the US and Canada on large infrastructure project, I am not supporting this temporary work system as it is overengineered and not time and cost effective. I am recommending medium scale for a section of 5 km roadway reconstruction and new pavement or surface maintenance the traditional construction way. Today we have worldwide experience in the construction of roadways and various paving selections. Good equipment like John Deere (Voegele) Caterpillar and Dynapac is available for any size of new or maintenance roadwork. Traffic control can be managed with detours and or temporary full or limited lane / road closures. The key for a successful workexecution is planning and engineering to the details. Japanese engineers and contractors are the very best examples for study proper work preparation and quality execution. Further I am recommending onsite dedicated mobile crushers and asphalts hot-mix and concrete batch plants.
As a Swiss / US Civil Engineer working in the US and Canada on large infrastructure project, I am not supporting this temporary work system as it is overengineered and not time and cost effective. I am recommending medium scale for a section of 5 km roadway reconstruction and new pavement or surface maintenance the traditional construction way. Today we have worldwide experience in the construction of roadways and various paving selections. Good equipment like John Deere (Voegele) Caterpillar and Dynapac is available for any size of new or maintenance roadwork. Traffic control can be managed with detours and or temporary full or limited lane / road closures. The key for a successful workexecution is planning and engineering to the details. Japanese engineers and contractors are the very best examples for study proper work preparation and quality execution. Further I am recommending onsite dedicated mobile crushers and asphalts hot-mix and concrete batch plants.
faszinierend wie man die Kosten maximieren kann. Was spricht dagegen eine wirtschaftlich wertlose Moorlandschaft zu asphaltieren? Ich denke der Schweizer Staat hat viel zu viel Geld!
und das alles im laufendem verkehr, in Deutschland hätte man die bahn erstmal beidseitig für 3 wochen gesperrt nur um die brücke aufzubauen 😂😂
Faschisten. Schlimmer wie nordkorea.
Währendessen ich als Deutscher, wenn einer mit 120 vor mir auf der Autobahn fährt: "FAHR SCHNELLER DU BIMSBIRNE!!!!"
Man könnte auch 100km/h für LKW einführen. Würde das dann nicht auch harmonisieren?
Lkw dürfen nur Max 85 fahren.
@@sedkosa8440 Das könnte man ändern.
Bonsoir Je constate encore une fois que la vidéo n'est pas dans ma langue.... malgré le titre en Français Je trouve très bien cette démarche d'information de la part de la Confédération ... Mais si il vous plaît pour trois langues faites trois chaînes UA-cam dans chacune de langue officiel MERCI 🤝🤝🙏
Это фантастика.. Экономмчно и быстро.
Вот где "эффективно" осваивают деньги=)
Das funktioniert so lang, bis wieder irgend äs Schnäggli oder Käferli entdeckt wird, und dänn gits wieder än Grund zums Projekt versänke. zum x-te mal.
Das ist genial
Super Technik. Habe mir jetzt drei Videos angeschaut und bei Minute 8:17 beginnt der Aufbau der Bridge auf der Autobahn. Aber warum eigentlich auf der Autobahn? Könnte das nicht in zwei Teilsegmenten vormontiert tagsüber außerhalb fertig gemacht werden und dann in zwei Segmenten auf die Autobahn aufgefahren und anschließend gekoppelt werden?
Bei unser Stau finde ich sehr gut
oder Astra Bridge übers Moor
Wie wärs wenn man das Volk entscheiden lässt, ob der Schutz des Moores hier aufgehoben wird, anstatt diese absurden Planungsorgien weiter zu betreiben? Früher war die Schweiz mal direktdemokratisch.
Schliesst endlich diese mikrige Lücke. Dann muss ich aus dem Rheintal zum Flughafen nicht über die sich immer im Stau befindende Autobahnumfahrung Zürich fahren. Hier wäre ich schneller am Ziel.
ich würde noch eine Variante mit einem Tunnel unter dem Pfäffikersee, dem Greifensee und unter Zürich prüfen, falls man noch weitere Ideen braucht.
Wieviel Varianten will man denn noch prüfen? Aus Kostengründen würde ich zwischen dem Tunnel oder der oberirdischen Variante mit Anschluss Opfikon entscheiden. Tunnel lang ist doch Irrsinn.
Nein zur Autobahn via Ottikon nach Wetzikon. Wieder einmal möchten die grünen Ideologen jegliche Grundlage für ein gutes Jungscharprogramm wegnehmen, in dem der Parkplatz des Schlachthaus bei Gossau, was ein beliebter Treffpunkt der Kinder und Jugendlichen der Jugendarbeit von Gossau ist sowie der angrenzende Wald mit der 72 h Feuerstelle wegnimmt und zerstört, Somit können christliche Programme nicht mehr an diesen Orten statt finden und die Kinder können diesen Teil der Gossauer Natur nicht mehr kennen lernen. Natürlich gibt es in Grüt, Ottikon, Gossau; Bertschikon und Herschmetteln viele andere Orte, die genutzt werden, aber natürlich muss der Wald, der direkt vor den Toren des Dorfes ist, zerstört werden. Die Ideologen der Woken und Grünen Ideologie möchten somit ganz klar verhindern, dass wir jungen Christen den nachfolgenden Generationen tolle und wichtige Dinge fürs Leben vermitteln (z. B. Feuer machen) Nein zu den Varianten, die durch Gossau ZH führen, ja zur Variante Tief.
Finde mir mal jemand bei den Grünen, welcher überhaupt eine dieser Variante unterstützt... Diese ganze Autobahn-Spinnerei kommt nur von den bürgerlichen, da ist plötzlich alles Landwirtschaftsland egal, hauptsache man kann mit dem Haushaltspanzer überall hinfahren!
Absolute Verschwendung von Steuergelder!
Endlich auch mal was für uns Autofahrer! 👋
@@beastbmwix sehe also um einiges mehr Baustellen für den Autoverkehr als für andere Verkehrsmittel
Werden wir die Realisierung noch erleben??
Hoffentlich nicht
Denke leider nein 😢
Danke für das informative Video. Wird höchste Zeit dass das Projekt vom Schubladenhüter in die Ausführung geführt wird.
Excelente 👌
Genial! Und hat sicher spass gemacht das so zu testen 😉
Die wird und muess doppelspurig werde.
Ich würde an diesem Projekt Folgendes verbessern: - kein Ersatzneubau der Brücke Tannacker (Es hat ca. 600m vor und nach der Brücke bestehende Unterführungen. Für mich hat die Brücke keine Erschliessungsfunktion, weder für Landwirtschaft, Freizeitverkehr und andere Verkehrsteilnehmer.) - keine Lärmschutzwände bei der Raststätte (Das ist Luxus, den wir nicht brauchen. An einer Autobahnraststätte darf es laut sein.) - Lärmschutzwände aus Schweizer Holz bauen (Die momentan verbauten Beton-Lärmschutzwände finde ich scheusslich.)
Muss das Woblentalviadukt auch ausgebaut werden? Denn in Fahrtrichtung Bern hat es bis anhin lediglich drei Fahrspuren auf der Brücke. Auf dem Video ist das leider sehr schlecht erkennbar. Es sieht fast so aus, als ob die Veloroute für eine vierte Spur und die SABA Fischrain geopfert würde. Stimmt das?
Der Ausbau des Grauholz ist der Beweis, dass ASTRA weiss nicht wo es staut! Da reicht es schon das Radio am Morgen und Abend einzuschalten um die genauen Standorte zu kennen.
Bringt mir als Zürcher nichts. Macht besser was gegen die Einwanderung.
Ich fahre die Strecke Kirchberg - Bern seit drei Jahren jeden Tag zur Stosszeit. Es gibt zwar zwischenzeitlich etwas Stau oder stockender Verkehr auf dieser Achse, jedoch braucht es hier keine zusätzliche Spur. Von mir aus gesehen, kann man das Geld besser in andere Projekte oder Sanierungen stecken. Wenn hier eine zusätzliche Spur kommt, werden wir mittel - langfristig wieder die gleichen "Probleme" haben, welche sich wahrscheinlich noch verschlimmern werden, da das Chaos durch die zusätzlichen Autos im Wankdorf / Forsthaus alles noch mehr verschlimmern werden. Von mir aus gesehen sollte die Politik flächendeckend die Gleitzeit einführen und Homeofficemöglichkeiten forcieren. Schon ab 8 Uhr morgens kann man hier auf dieser Strecke meistens Stau- und Ruckelfrei durchfahren.
An alle die hier nur motzen und kritisieren: Die Autobahn A1 ist die grösste und wichtigste Verbindung durch die Schweiz. Es passieren nicht nur Personen sondern vor allem auch praktisch die ganze Fracht die in der Schweiz transportiert wird über die A1. Die Schweiz ist in wenigen Jahren von 6 Mio auf 9 Mio Einwohner angewachsen. Dementsprechend gibt es auch viel mehr Personen, Material und Güter die transportiert werden müssen und ein Ausbau der Hauptverkehrsachse ist längst überfällig.
Hier geht es nicht um die A1 im Projekt, sondern um den Grauholz Ausbau. Dieser ist unnötig im Vergleich zur restlichen A1
Was sagt eigentlich das ASTRA zum Thema "Induzierte Nachfrage"?
Ihr könnt noch so viele Spuren machen, bringt alles nichts wenn die meisten Verkehrsteilnehmer auf der linken Spur fahren und die übrigen Spuren fast leer sind.
also ich sehe keinen grossen unterschied... was hat schon wieder diese planung gekostet??
Man sucht verzweifelt Geld und beginnt dann an der Bildung zu sparen, wirft aber Unsummen für solche Projekte raus. Ganz zu schweigen vom Kulturland, was verschwendet wird. Das versteht niemand.
Super Sache!
Wenn unsere Regierung und das Parlament nicht bereit ist die Bevölkerungszahl zu limitieren braucht es halt immer mehr Platz. Jedes demokratische Land kriegt die Regierung die es wählt.
Falls es dir zu viel wird, steht dir die Möglichkeit frei, in einem autoritär regierten Land zu leben. Daran mangelt es ja nicht…
@@kasparnickborn6682 Bin absolut zufrieden mit dem Ausbau der A1. Gute Sache 👍
Einundzwanzig.. zweiundzwanzig...
Alle Autobahnen in der Schweiz bräuchten standartmässig drei Spuren.
@@tobi.br.-96 Nur weil es an 2-3 Stunden pro Tag staut? Die restlichen 20 Stunden hat es verhältnismässig kaum verkehr.
Das ganze Projekt ist Mist. Man sollte das Grauholz Untertunneln, zudem ist es 20 Jahre zuspät dran.
Gute Idee, leider schwer finanzierbar. Das Ostring wird wohl zuerst drankommen…
Dieser Ausbau muss verhindert werden!
Nein! Das ist dringend nötig!
Ja, ich wehre mich auch!
@@meiermarco6757 Warum?
Super! Höchste Zeit!
Warum?
@@NathanIoupWeil dieser Ausbau dringend notwendig ist!
@@meiermarco6757Haben Sie schon mal etwas von induzierter Nachfrage gehört?
@@meiermarco6757 Das beantwortet meine Frage nicht. Hättest genau so gut sagen können: Darum.
@@meiermarco6757Warum?
Sinnloser kann man Geld nicht ausgeben😕
Chissà che burdell😂