Naeem Ali
Naeem Ali
  • 29
  • 64 792
Module 2 - Fixed Block vs Moving Block
This video describes and compares the fixed block signalling philosophy versus moving block philosophy enabled by CBTC.
Naeem Ali
CBTC Solutions
Переглядів: 523

Відео

Module 1 - Brief History of Rail and CBTC
Переглядів 5303 місяці тому
Module 1 - Brief History of Rail and CBTC
CBTC Explained - e-Learning for Rail Professionals
Переглядів 1,1 тис.2 роки тому
CBTC e-Learning series - Learn at your own pace CBTC Explained for Rail Professionals is an online introductory CBTC overview course designed to get your feet wet as it relates to CBTC technologies. Upgrade your skills, register now for this e-learning course now at CBTCSolutions.ca/cbtc-explained Created by Naeem Ali a CBTC Specialist.
CBTC Training - E-Learning for Rail Professionals
Переглядів 8402 роки тому
CBTC e-Learning series CBTC Explained for Rail Professionals is an online introductory CBTC overview course designed to get your feet wet as it relates to CBTC technologies. Upgrade your skills, register now for this e-learning course now at CBTCSolutions.ca/cbtc-explained Created by Naeem Ali a CBTC Specialist.
GoA 4 - Unattended Train Operations (UTO)
Переглядів 1,4 тис.2 роки тому
At the GoA 4, the system is fully automated, there are no drivers or operations staff on-board the train. CBTCSolutions.ca
GoA 3 - Driverless Train Operations (DTO)
Переглядів 7822 роки тому
A GoA 3 system is taking more control of the subway infrastructure. A train driver is no longer required but operation staff are required at the platforms
GoA 2 - Semi Automated Train Operation (DTO)
Переглядів 1,2 тис.2 роки тому
Grade of Automation 2 (GoA 2) is where the core automation functionality is introduced. At this level, the train driver does not control propulsion or braking. CBTCSolutions.ca
GoA 1 - Non Automated Train Operation
Переглядів 1 тис.2 роки тому
A GoA 1 system is a conventionally signalled system, common to the majority of subway and metros around the world. CBTCSolutions.ca
GoA 0 - Line of Sight Operation
Переглядів 2952 роки тому
Grade of Automation or GoA 0 is a system that operates exclusively off of operating procedures. There is no signalling system to protect the trains. CBTCSolutions.ca
Grades of Automation (GoA) Introduction
Переглядів 6212 роки тому
IEC 62290-1 defines the Grades of Automation levels an urban transit can be classified for. This clip is introduces the topic.
IEEE 1474.1 - The Main CBTC Standard
Переглядів 6564 роки тому
If there is one standard about CBTC that your should understand, it is IEEE 1474.1. Naeem Ali CBTC Specialist Director & Principal Consultant CBTC Solutions Inc. CBTCSolutions.ca
Types of CBTC Architectures
Переглядів 1,3 тис.4 роки тому
CBTC designs are not the same but they fall into 1 of 3 types of CBTC architectures. Naeem Ali CBTC Specialist Director & Principal Consultant CBTC Solutions Inc. CBTCSolutions.ca
ATS - The Third Building Block of a CBTC System
Переглядів 1,8 тис.4 роки тому
A CBTC system is made up of 3 build blocks: ATP - Automatic Train Protection ATO - Automatic Train Operation ATS - Automatic Train Supervision This video provides further details regarding the ATS building block. Naeem Ali CBTC Specialist Director & Principal Consultant CBTC Solutions Inc. CBTCSolutions.ca
ATO - The Second Building Block of a CBTC System
Переглядів 1 тис.4 роки тому
A CBTC system is made up of 3 build blocks: ATP - Automatic Train Protection ATO - Automatic Train Operation ATS - Automatic Train Supervision This video provides further details regarding the ATO building block. Naeem Ali CBTC Specialist Director & Principal Consultant CBTC Solutions Inc. CBTCSolutions.ca
ATP - The First Building Block of a CBTC System
Переглядів 2,4 тис.4 роки тому
A CBTC system is made up of 3 build blocks: ATP - Automatic Train Protection ATO - Automatic Train Operation ATS - Automatic Train Supervision This video provides an overview of the three build blocks and goes into further details regarding the ATP. Naeem Ali CBTC Specialist Director & Principal Consultant CBTC Solutions Inc. CBTCSolutions.ca
CBTC Configurations
Переглядів 8125 років тому
CBTC Configurations
Types of Signalling Systems
Переглядів 4,5 тис.5 років тому
Types of Signalling Systems
What is CBTC?
Переглядів 2,9 тис.5 років тому
What is CBTC?
CBTC 101: CBTC Concepts, Standards and Architectures
Переглядів 22 тис.5 років тому
CBTC 101: CBTC Concepts, Standards and Architectures
Conclusion
Переглядів 1686 років тому
Conclusion
Step 6: Write the ConOps
Переглядів 1,5 тис.6 років тому
Step 6: Write the ConOps
Step 5: Establish System Boundaries & Interfaces
Переглядів 8336 років тому
Step 5: Establish System Boundaries & Interfaces
Step 4: Determine System Operations
Переглядів 4926 років тому
Step 4: Determine System Operations
Step 3: Translate User Priorities into System Capabilities
Переглядів 6716 років тому
Step 3: Translate User Priorities into System Capabilities
Step 2: Define CBTC Users and their Priorities
Переглядів 5926 років тому
Step 2: Define CBTC Users and their Priorities
Step 1: Establish a Working Group
Переглядів 4506 років тому
Step 1: Establish a Working Group
Why Do I need a ConOps?
Переглядів 9956 років тому
Why Do I need a ConOps?
What is a ConOps?
Переглядів 7 тис.6 років тому
What is a ConOps?
6 Steps to Create a Concept of Operations Document in a CBTC Application (Full Video)
Переглядів 7 тис.6 років тому
6 Steps to Create a Concept of Operations Document in a CBTC Application (Full Video)

КОМЕНТАРІ

  • @aparajaakhila4055
    @aparajaakhila4055 4 місяці тому

    Very useful. GOA 2 used in Hyderabad metro in INDIA

  • @sathishbalu100
    @sathishbalu100 4 місяці тому

    Well explained sir, lots of thanks for sharing

  • @Dineshkumar-wy2nf
    @Dineshkumar-wy2nf 5 місяців тому

    Thanks for your effort

  • @kotipallisivaji1
    @kotipallisivaji1 6 місяців тому

    thank you for the efforts .more helpful

  • @fhs7838
    @fhs7838 7 місяців тому

    It's pretty interesting to see train integrity check is only at GoA4. Most CBTC system, due to moving block, need train integrity check to clear the "block".

  • @asmathnisa4626
    @asmathnisa4626 8 місяців тому

    a thorough explanation on CBT C system and its components and their current application across the world .....congrats on your effort expecting more videos in future

  • @ksba2000
    @ksba2000 9 місяців тому

    Is the course available? The link doesn't work

    • @CBTCSolutions
      @CBTCSolutions 5 місяців тому

      I updated the link above. Please have a look.

  • @Asestar
    @Asestar 10 місяців тому

    Really appreciate the clear, concise and calm explanation of the topic.

  • @ankit41395
    @ankit41395 Рік тому

    in case of tripping of person, the train may be prevented to move by using the PSD system which will not allow the PSD to move and may allow the OCC operator to find out the reason of not closing the doors. As the PSD doors have Lazer sensors which will detect the obstruction or in case of no sensor the PSD doors may be of L-channel which will reduce the gap between PSD doors and Train door. Therefore, incase of tripping the passenger, his half of the body will obstruct either the saloon door or mostly chances of obstructing the PSD doors.

  • @Srinivas0503
    @Srinivas0503 Рік тому

    Good info

  • @Srinivas0503
    @Srinivas0503 Рік тому

    Good information

  • @Srinivas0503
    @Srinivas0503 Рік тому

    Good

  • @mageshsinfo
    @mageshsinfo Рік тому

    What is Guideway??

  • @soorajkb7413
    @soorajkb7413 Рік тому

    Informative

  • @Gary-wp1wt
    @Gary-wp1wt 2 роки тому

    GOA 2 PARIS METRO .. LINE 6

  • @Gary-wp1wt
    @Gary-wp1wt 2 роки тому

    GOA2 : ONLY DOOR CLOSING BY DRIVER..

  • @kamangareats2228
    @kamangareats2228 2 роки тому

    Great work Mr Naeem but the course is too expensive, I think it should be a free online course.

    • @CBTCSolutions
      @CBTCSolutions 2 роки тому

      Thank you for your comment Mr. Kamangar but developing original content like this cannot be developed for free, especially when you consider that there is very little written or taught about CBTC. The cost for this course is very reasonable in the field of corporate training and developing an animated course is expensive. If I had to offer this for free, I would not have created this course considering the time, effort and money I spent. Take Care.

  • @Srinivas0503
    @Srinivas0503 2 роки тому

    Thank you for explanation

  • @Tarek3332
    @Tarek3332 2 роки тому

    Well explained again

  • @Tarek3332
    @Tarek3332 2 роки тому

    Very informative

  • @Tarek3332
    @Tarek3332 2 роки тому

    Very good Concept. In densely populated South East Asia on main lines this will be the future.

  • @australianprofessionalnetw1870
    @australianprofessionalnetw1870 2 роки тому

    In Melbourne, Australia Metro Tunnel Project MTP is rolling out CBTC GoA2 on Pakenham Cranbourne and Sunbury lines and same will extend to Melbourne Airport Rail Link in near future

  • @nsgupta
    @nsgupta 2 роки тому

    Platform Screen Doors, Manual Screen doors for entry to Trackside and interlocked with Signaling, Emergency Trip Switch(Traction), Emergency Stop Plunger( For Signaling Braking), and Staff protection Key system( creating safe zones for a staff working on Track and interlocked with Traction OFF) are normally implemented even in GOA 2 system. Does that mean that only an Intrusion detection system is to be introduced to migrate to GOA3?

  • @alandesti2556
    @alandesti2556 2 роки тому

    🤭 pքɾօʍօʂʍ

  • @Smaddoc1
    @Smaddoc1 2 роки тому

    Thanks for sharing. There are lots of GoA 2 systems as far as I am aware. Just in the UK there is the Northern Line, Jubilee Line, Victoria Line and others.

  • @wattoman28
    @wattoman28 2 роки тому

    This was excellent 👏

  • @barrychen9009
    @barrychen9009 2 роки тому

    Thanks for your sharing, My understanding is that the GOA 3 and GOA 4 for Signaling system has nothing to do right? But only train attendant required in GOA 3 and fully automation in GOA 4. In this case if extra work is needed for on board Communication System?

  • @ahdar3605
    @ahdar3605 2 роки тому

    Excellent presentation. Thank you for sharing.

  • @randyblu25
    @randyblu25 3 роки тому

    In Toronto (as you know) the TTC is in the very slow process of changing line 1 to ATC. What all does ATC cover besides train movement? (and i have got to say i LOVE the fact the system stops the train at stations so smoothly without using the full brake like on line 2...lol)

  • @AungWinHtutGH
    @AungWinHtutGH 3 роки тому

    Thank you so much for your excellent lecture, Sir!

  • @mohsinarju3864
    @mohsinarju3864 3 роки тому

    Thanks

  • @anandkumarjha6945
    @anandkumarjha6945 3 роки тому

    Sir what is cycle in signalling

  • @shashankshekhargaur8712
    @shashankshekhargaur8712 3 роки тому

    I'm thankfully to you for providing such good content... Please share more knowledge content on your channel for the new engineers all around the world

  • @SandeepKumar-eu8ht
    @SandeepKumar-eu8ht 3 роки тому

    One of the best explanations on CBTC. Thanks Naeem!

  • @snappy9061
    @snappy9061 3 роки тому

    Great presentation. Cheers

  • @kaiseri5073
    @kaiseri5073 3 роки тому

    Amazing. Thank you :)

  • @asadbutt6246
    @asadbutt6246 3 роки тому

    Brilliantly explained ! Thank you for sharing the information. This video has helped me a lot to understand the overview of the system and saved my time.

  • @nagabhooshanamvemula469
    @nagabhooshanamvemula469 4 роки тому

    Great informative.

  • @seyyidkocabay4669
    @seyyidkocabay4669 4 роки тому

    👍🏿

  • @n.kprasad1416
    @n.kprasad1416 4 роки тому

    Really a nice guide to cbtc.

  • @yuzhang8890
    @yuzhang8890 4 роки тому

    In the south of China, ATP+CTCT-2 will be used on some unban railways.

  • @kkomla
    @kkomla 4 роки тому

    I knew nothing to begin with. But thanks to your presentation i learn a lot about cbtc system. Thank you

  • @aselahars1
    @aselahars1 4 роки тому

    Very good & Educational Presenetation.

  • @ArshadAli-iv8rw
    @ArshadAli-iv8rw 4 роки тому

    Good afternoon sir can you please tell about conflicting routes in CBTC I'm the signalling student i do know about conflicting signals and conflicting points yet to know about conflicting routes plz answer my doubt sir

  • @ElumalaiS2024
    @ElumalaiS2024 4 роки тому

    Thank you so much. It is very useful. Great top level view of CBTC in term of IEEE 1474.3. Cheers :)

  • @balrajboddu4207
    @balrajboddu4207 4 роки тому

    very interesting and useful . many thanks for your time and interest in sharing this

  • @RAJA-nq6yj
    @RAJA-nq6yj 4 роки тому

    Treamonds overview explanation in a single webinar. Great efforts.... Kudos....

  • @BRAVOSlX
    @BRAVOSlX 4 роки тому

    thanx a lot again.

  • @awaismarwat6613
    @awaismarwat6613 4 роки тому

    Naeem Bhai apka koi contact number ??